You can prepare effectively for Civil Engineering (CE) Geomatics Engineering (Surveying) with this dedicated MCQ Practice Test (available with solutions) on the important topic of "Test: Earthwork Estimation - 2". These 10 questions have been designed by the experts with the latest curriculum of Civil Engineering (CE) 2026, to help you master the concept.
Test Highlights:
Sign up on EduRev for free to attempt this test and track your preparation progress.
Normally earthwork is estimated for 30 m lead for distance and 1.5 m lift for height or depth, and this distance of 30 m and the height of 1.5 m are known as ____
Detailed Solution: Question 1
The vertical alignment of a road, expressed as a series of grades, connected by parabolic curves is called ______
Detailed Solution: Question 2
Calculate the quantity of earthwork for 200 m length for a portion of road in an uniform ground the heights of banks at the two ends being 1.00 m and 1.60 m. The formation width is 10 mm and side slope 2:1. Assume that there is no traverse slope.
Detailed Solution: Question 3
A raised edge at the side of the roadway is known as _____
Detailed Solution: Question 4
A ________ is a thoroughfare, route, or way on land between two places that has been paved or otherwise improved to allow travel by foot or some form of conveyance, including a motor vehicle, cart, bicycle, or horse.
Detailed Solution: Question 5
___________ is the application of controlled amounts of water to plants at needed intervals.
Detailed Solution: Question 6
Typical lane widths range from ______ metres to _____ metres.
Detailed Solution: Question 7
Detailed Solution: Question 8
Designated point on a road where road marking or other means helps pedestrians cross safely is called?
Detailed Solution: Question 9
To calculate the volume of earthwork from contour plan for filling a depression or pond and for cutting a hillock _____ may be used conveniently.
Detailed Solution: Question 10