MCQ Practice Test & Solutions: Test: Optimal Power System Operation of Power Systems (10 Questions)

You can prepare effectively for Electrical Engineering (EE) GATE Electrical Engineering (EE) Mock Test Series 2027 with this dedicated MCQ Practice Test (available with solutions) on the important topic of "Test: Optimal Power System Operation of Power Systems". These 10 questions have been designed by the experts with the latest curriculum of Electrical Engineering (EE) 2026, to help you master the concept.

Test Highlights:

  • - Format: Multiple Choice Questions (MCQ)
  • - Duration: 30 minutes
  • - Number of Questions: 10

Sign up on EduRev for free to attempt this test and track your preparation progress.

Test: Optimal Power System Operation of Power Systems - Question 1

If  for a plant i with output Pand loss in the system being PL increases, the penalty factor of the system

Detailed Solution: Question 1

Penalty factor of the system is 

Test: Optimal Power System Operation of Power Systems - Question 2

The incremental fuel costs of two plants are given by 

For economic schedule of a load of 180 MW

Test: Optimal Power System Operation of Power Systems - Question 3

A generator is supplying a load. An incremental change in load of 4 MW requires generation to be increased by 6 MW. The cost at plant bus is ₹ 30/MWhr. The incremental cost at the receiving end is

Detailed Solution: Question 3

Test: Optimal Power System Operation of Power Systems - Question 4

The current distribution factors for the power system network shown below are given by

Detailed Solution: Question 4

Since the load is at plant 2 therefore,
Na2 = 0 and Na1 = 1

Test: Optimal Power System Operation of Power Systems - Question 5

The incremental transmission loss of a plant can’t be a

Detailed Solution: Question 5

The incremental transmission loss of a plant can be positive, a non-zero value but, can’t be zero.

Test: Optimal Power System Operation of Power Systems - Question 6

When generating units are loaded to equal incremental costs, it results in

Detailed Solution: Question 6

To minimize the total fuel cost, the generating units must operate at equal incremental cost of production.

Test: Optimal Power System Operation of Power Systems - Question 7

Unit of heat rate curve is

Detailed Solution: Question 7

Test: Optimal Power System Operation of Power Systems - Question 8

Unit of λ is

Detailed Solution: Question 8


Test: Optimal Power System Operation of Power Systems - Question 9

Cost curves are expressed as:

Test: Optimal Power System Operation of Power Systems - Question 10

The optimization problem is

26 docs|247 tests
Information about Test: Optimal Power System Operation of Power Systems Page
In this test you can find the Exam questions for Test: Optimal Power System Operation of Power Systems solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Optimal Power System Operation of Power Systems, EduRev gives you an ample number of Online tests for practice