Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  Topicwise Question Bank for Mechanical Engineering  >  Test: CPM & PERT - 2 - Mechanical Engineering MCQ

Test: CPM & PERT - 2 - Mechanical Engineering MCQ


Test Description

10 Questions MCQ Test Topicwise Question Bank for Mechanical Engineering - Test: CPM & PERT - 2

Test: CPM & PERT - 2 for Mechanical Engineering 2024 is part of Topicwise Question Bank for Mechanical Engineering preparation. The Test: CPM & PERT - 2 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: CPM & PERT - 2 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: CPM & PERT - 2 below.
Solutions of Test: CPM & PERT - 2 questions in English are available as part of our Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering & Test: CPM & PERT - 2 solutions in Hindi for Topicwise Question Bank for Mechanical Engineering course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: CPM & PERT - 2 | 10 questions in 30 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering Exam | Download free PDF with solutions
Test: CPM & PERT - 2 - Question 1

In CPM network critical path denotes the

Test: CPM & PERT - 2 - Question 2

In PERT, the distribution of activity times is assumed to be

Detailed Solution for Test: CPM & PERT - 2 - Question 2

In PERT the activity times follow Beta distribution.

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: CPM & PERT - 2 - Question 3

In PERT analysis a critical activity has

Test: CPM & PERT - 2 - Question 4

The expected time (te) of a PERT activity in term s of optimistic time (to), pessimistic time (tp) and most likely time (tm) is given by

Detailed Solution for Test: CPM & PERT - 2 - Question 4

The expected time (te) of PERT activity in terms of optimistic time (to), pessimistic-time (tp) and most likely time (tm ) is given by,

Test: CPM & PERT - 2 - Question 5

The critical path of a network is the path that

Test: CPM & PERT - 2 - Question 6

In PERT the span of time between the optimistic and pessimistic time estimates of an activity is

Test: CPM & PERT - 2 - Question 7

In an activity has zero slack, it implies that

Test: CPM & PERT - 2 - Question 8

Activity-on-Arrow (AOA) diagram is preferred over Activity-on-Node (AON) diagram because

Test: CPM & PERT - 2 - Question 9

The most likely time (m) is ’mode’ of the

Test: CPM & PERT - 2 - Question 10

The variance of the completion time for a project is the sum of variance of

45 videos|314 tests
Information about Test: CPM & PERT - 2 Page
In this test you can find the Exam questions for Test: CPM & PERT - 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: CPM & PERT - 2, EduRev gives you an ample number of Online tests for practice

Top Courses for Mechanical Engineering

Download as PDF

Top Courses for Mechanical Engineering