Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  Mechanical Engineering SSC JE (Technical)  >  Test: Power Plant Engineering- 2 - Mechanical Engineering MCQ

Test: Power Plant Engineering- 2 - Mechanical Engineering MCQ


Test Description

25 Questions MCQ Test Mechanical Engineering SSC JE (Technical) - Test: Power Plant Engineering- 2

Test: Power Plant Engineering- 2 for Mechanical Engineering 2024 is part of Mechanical Engineering SSC JE (Technical) preparation. The Test: Power Plant Engineering- 2 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: Power Plant Engineering- 2 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Power Plant Engineering- 2 below.
Solutions of Test: Power Plant Engineering- 2 questions in English are available as part of our Mechanical Engineering SSC JE (Technical) for Mechanical Engineering & Test: Power Plant Engineering- 2 solutions in Hindi for Mechanical Engineering SSC JE (Technical) course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: Power Plant Engineering- 2 | 25 questions in 50 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study Mechanical Engineering SSC JE (Technical) for Mechanical Engineering Exam | Download free PDF with solutions
Test: Power Plant Engineering- 2 - Question 1

The designation of a cross compounded turbineis given as 'cc 4F 32' Here '32' represents

Test: Power Plant Engineering- 2 - Question 2

Compounding of impulse turbine is done to

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Power Plant Engineering- 2 - Question 3

Which of the following is a velocity compoundedturbine.

Test: Power Plant Engineering- 2 - Question 4

Which of the following is a 100% Reactionturbine

Test: Power Plant Engineering- 2 - Question 5

Maximum Diagram efficiency for a impulse turbine is

Test: Power Plant Engineering- 2 - Question 6

The optimun speed ratio   of a reaction turbine for maximum efficiency is

Test: Power Plant Engineering- 2 - Question 7

Water from feed regulating system first enters the

Test: Power Plant Engineering- 2 - Question 8

Natural circulation boilers does not require.

Test: Power Plant Engineering- 2 - Question 9

Between economiser and electrostaticPrecipitator lies

Test: Power Plant Engineering- 2 - Question 10

Heat transfer in the furnace is maximum due to

Test: Power Plant Engineering- 2 - Question 11

Once through boiler does not have the following

Test: Power Plant Engineering- 2 - Question 12

In a boiler is mass of liquid water flow is 10 kgand mass of steam produced is 1 kg circulationratio is

Test: Power Plant Engineering- 2 - Question 13

Which of the following is a boiler mounting

Test: Power Plant Engineering- 2 - Question 14

Which of the following is a boiler assesory ?

Test: Power Plant Engineering- 2 - Question 15

Which of the following is for boiler safety

Test: Power Plant Engineering- 2 - Question 16

Boiler Accessories are used for:

Test: Power Plant Engineering- 2 - Question 17

Which of the following are water tube boiler.

Test: Power Plant Engineering- 2 - Question 18

Which of the following boilers has naturalcirculation.

Test: Power Plant Engineering- 2 - Question 19

Which of the following is a internally fired boiler.

Test: Power Plant Engineering- 2 - Question 20

Which of the following is a low pressure boiler.

Detailed Solution for Test: Power Plant Engineering- 2 - Question 20

  Cochran boiler is modification of simple vertical boiler where heating surface has been increased by increasing numbers of fire tubes.

 It is used for steam generation at low rate.

 It is a fire tube type boiler.

Test: Power Plant Engineering- 2 - Question 21

The purpose of electrostatic precipitator is

Test: Power Plant Engineering- 2 - Question 22

Blow off cock is used to

Test: Power Plant Engineering- 2 - Question 23

In brayton cycle heat is supplied at constant

Test: Power Plant Engineering- 2 - Question 24

Mach (M) number for hypersonic flow is

Test: Power Plant Engineering- 2 - Question 25

Eulers power for a rotary maching can be givenas

5 videos|103 docs|59 tests
Information about Test: Power Plant Engineering- 2 Page
In this test you can find the Exam questions for Test: Power Plant Engineering- 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Power Plant Engineering- 2, EduRev gives you an ample number of Online tests for practice

Top Courses for Mechanical Engineering

Download as PDF

Top Courses for Mechanical Engineering