Test: Material Requirement Planning


10 Questions MCQ Test Topicwise Question Bank for Mechanical Engineering | Test: Material Requirement Planning


Description
This mock test of Test: Material Requirement Planning for Mechanical Engineering helps you for every Mechanical Engineering entrance exam. This contains 10 Multiple Choice Questions for Mechanical Engineering Test: Material Requirement Planning (mcq) to study with solutions a complete question bank. The solved questions answers in this Test: Material Requirement Planning quiz give you a good mix of easy questions and tough questions. Mechanical Engineering students definitely take this Test: Material Requirement Planning exercise for a better result in the exam. You can find other Test: Material Requirement Planning extra questions, long questions & short questions for Mechanical Engineering on EduRev as well by searching above.
QUESTION: 1

Which of the following input data are needed for MRP?
1. Master production schedule
2. Inventory status
3. Bill of materials
4. Machine capacity

Select the correct answer from above:

Solution:
QUESTION: 2

In an MRP system, component demand is

Solution:
QUESTION: 3

Demand for a given item is said to be dependent if

Solution:
QUESTION: 4

A master production schedule specifies

Solution:
QUESTION: 5

A master production schedule specifies

Solution:
QUESTION: 6

The input to MRP which lists the assemblies, subassemblies, parts and raw materials needed to produce one unit of finished product is known as

Solution:
QUESTION: 7

One way to facilitate production scheduling and production in firms making a large number of different final products is to use

Solution:
QUESTION: 8

Which of the following statements best compares modular bills and phantom bills?

Solution:
QUESTION: 9

If the demand for product A is 50 units, what will be the gross requirement for component E?

Solution:

As per given dependent demand figure, Requirement of B = 50 x 2 = 100 Requirement of C = 50 x 3 = 150 Requirement of D = 150 x 1 = 150 Requirement of E= 150 x 2 = 300

QUESTION: 10

The minimum record accuracy required for successful MRP is approximately

Solution: