Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  Topicwise Question Bank for Mechanical Engineering  >  Test: Loading & Scheduling - 1 - Mechanical Engineering MCQ

Test: Loading & Scheduling - 1 - Mechanical Engineering MCQ


Test Description

10 Questions MCQ Test Topicwise Question Bank for Mechanical Engineering - Test: Loading & Scheduling - 1

Test: Loading & Scheduling - 1 for Mechanical Engineering 2024 is part of Topicwise Question Bank for Mechanical Engineering preparation. The Test: Loading & Scheduling - 1 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: Loading & Scheduling - 1 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Loading & Scheduling - 1 below.
Solutions of Test: Loading & Scheduling - 1 questions in English are available as part of our Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering & Test: Loading & Scheduling - 1 solutions in Hindi for Topicwise Question Bank for Mechanical Engineering course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: Loading & Scheduling - 1 | 10 questions in 30 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering Exam | Download free PDF with solutions
Test: Loading & Scheduling - 1 - Question 1

Routing and scheduling are integral part of

Test: Loading & Scheduling - 1 - Question 2

The information about when should start and how much work should be completed during a certain period .is provided by the act referred to as

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Loading & Scheduling - 1 - Question 3

The process which determines the programme for the operations is called

Test: Loading & Scheduling - 1 - Question 4

Routing decides

Test: Loading & Scheduling - 1 - Question 5

The routing function in a production system design is concerned with

Detailed Solution for Test: Loading & Scheduling - 1 - Question 5

The routing function in a production system design is concerned with Machine utilization.

Test: Loading & Scheduling - 1 - Question 6

Routing in production planning and controls refers to the

Detailed Solution for Test: Loading & Scheduling - 1 - Question 6

Routing determines what work is to be done and where and how it will be done. Taking from raw material to the finished product, routing decides the path and sequence of operations to be performed on the job from one machine to another.
There are four steps in the process of production planning and control:

  1. Routing: Routing can be defined as the process of deciding the path (route) of work and the sequence of operations.
  2. Scheduling: Scheduling function determines when an operation is to be performed, or when work is to be completed.
  3. Dispatching: It is the action, doing or implementation stage. It comes after routing and scheduling. Dispatching means starting the process of production. It provides the necessary authority to start the work.
  4. Expedition or follow-up: It is designed to keep track of the work effort. The aim is to ensure that what is intended and planned is being implemented. It maintains proper records of work, delays, and bottleneck. Such records can be used in the future to control production.
Test: Loading & Scheduling - 1 - Question 7

Dispatching is concerned with

Test: Loading & Scheduling - 1 - Question 8

In manufacturing management, the term dispatching is used to describe

Detailed Solution for Test: Loading & Scheduling - 1 - Question 8

Dispatching: It is execution of planning. It is concerned with starting the work (or process), it therefore ensure that the plans are properly implemented. It is the physical handling over of a manufacturing order to the operating faciiity. it can be defined as release of orders and instructions for the starting of production for any item in accordance with the route sheet and schedule charts.

Test: Loading & Scheduling - 1 - Question 9

Which of the following card is not used in dispatching?

Test: Loading & Scheduling - 1 - Question 10

Consider the following statements:
Dispatching
1. is the action of operations, planning and control
2. release work to operation divisions
3. conveys instructions to the shop floor

Of these statements:

45 videos|314 tests
Information about Test: Loading & Scheduling - 1 Page
In this test you can find the Exam questions for Test: Loading & Scheduling - 1 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Loading & Scheduling - 1, EduRev gives you an ample number of Online tests for practice

Top Courses for Mechanical Engineering

Download as PDF

Top Courses for Mechanical Engineering