Test: Power Systems - 6


25 Questions MCQ Test Electrical Engineering SSC JE (Technical) | Test: Power Systems - 6


Description
This mock test of Test: Power Systems - 6 for Electrical Engineering (EE) helps you for every Electrical Engineering (EE) entrance exam. This contains 25 Multiple Choice Questions for Electrical Engineering (EE) Test: Power Systems - 6 (mcq) to study with solutions a complete question bank. The solved questions answers in this Test: Power Systems - 6 quiz give you a good mix of easy questions and tough questions. Electrical Engineering (EE) students definitely take this Test: Power Systems - 6 exercise for a better result in the exam. You can find other Test: Power Systems - 6 extra questions, long questions & short questions for Electrical Engineering (EE) on EduRev as well by searching above.
QUESTION: 1

Which distribution system is more reliable?

Solution:
QUESTION: 2

The insulation resistance test is performed on power line with

Solution:
QUESTION: 3

The commercial sources of energy are

Solution:
QUESTION: 4

What is the total power installed capacity (approximate) in India?

Solution:
QUESTION: 5

The power development programmes that are possible in Tamil Nadu are largely based on

Solution:
QUESTION: 6

The power output from an hydroelectric power plant depends on

Solution:
QUESTION: 7

What is the correct expression for the electricalpower developed by a hydroelectric plant in KW?

Solution:
QUESTION: 8

A hydroelectric power station is commonly found in

Solution:
QUESTION: 9

In hydroelectric power plants

Solution:
QUESTION: 10

The advantage (s) of hydro plants is/are

Solution:
QUESTION: 11

The largest size of hydroelectric unit in India is

Solution:
QUESTION: 12

The flow duration curve at a given head of a hydroelectric plant is used to determine

Solution:
QUESTION: 13

In hydropower stations what is an enlarged body of water just above the intake and used as a regulating reservoir, called?

Solution:
QUESTION: 14

In high head hydroelectric power plant, the velocity of water flow in penstock is around

Solution:
QUESTION: 15

What is the function of booms?

Solution:

Booms are the one of those structures made at the intake. They are constructed to prevent unwanted solid materials from flowing into the penstock. Solid materials like icebergs, wood logs or other heavy materials which may cause damage to the turbine blades if reached there.

QUESTION: 16

The function of a surge tank is to

Solution:
QUESTION: 17

Water hammer occurs in

Solution:
QUESTION: 18

For variable heads of near about but less than 30 metres, Which type of tubines is used in hydropower stations?

Solution:
QUESTION: 19

For harnessing lower variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjustable vanes is

Solution:
QUESTION: 20

The specific speeds of Kaplan, Francis and Pelton turbines are in

Solution:
QUESTION: 21

An impulse turbine

Solution:
QUESTION: 22

In Francis turbine runner, the number of blades is usually of the order of

Solution:
QUESTION: 23

The maximum head of a Kaplan turbine is limited to

Solution:
QUESTION: 24

In India, pumped storage power plant

Solution:
QUESTION: 25

The pumped storage scheme is employed to supply

Solution:

Similar Content

Related tests