This mock test of Crashing Of Networks And Engineering Economy for Civil Engineering (CE) helps you for every Civil Engineering (CE) entrance exam. This contains 10 Multiple Choice Questions for Civil Engineering (CE) Crashing Of Networks And Engineering Economy (mcq) to study with solutions a complete question bank. The solved questions answers in this Crashing Of Networks And Engineering Economy quiz give you a good mix of easy questions and tough questions. Civil Engineering (CE) students definitely take this Crashing Of Networks And Engineering Economy exercise for a better result in the exam. You can find other Crashing Of Networks And Engineering Economy extra questions, long questions & short questions for Civil Engineering (CE) on EduRev as well by searching above.
QUESTION: 1

In time-cost optimization of a project, crashing is done

Solution:
QUESTION: 2

Cost-benefit studies are essential to

Solution:
QUESTION: 3

The optimum duration is the

Solution:

The direct cost increases with decrease in duration while the indirect cost decreases with decrease in duration. The optimum duration in the crashing of activities will correspond to minimum total cost (direct + indirect) of project completion.

QUESTION: 4

Match List-1 (Cost) with List-il (Feature) and select the correct answer using the codes given below the lists:
List-I
A. Optimal cost
B. Overheadcost
C. Direct cost
D. Indirect cost

List-II
1. Activity related
2. Developed by crashing process
3. Project-related
4. Contained in, or contributing exclusively to the related product

Solution:

Fixed indirect cost is independent of the progress of project. It includes initial expenditure for purchase of equipment, installation and storage charge required for different activities.

QUESTION: 5

In cost time optimization of a project, the project can be crashed by expediting

Solution:
QUESTION: 6

Which of the following represents the reduction induration?

Solution:
QUESTION: 7

Consider the following statements:
Crashing a project in terms of its duration would result in
1. an increase in the indirect cost
2. a decrease in the indirect cost
3. a decrease in the direct cost
4. an increase in the direct cost

Which of these statements are correct?

Solution:

Crasing reduces duration and therefore indirect cost decreases while direct cost increase.

QUESTION: 8

The cost slope is defined as

Solution:
QUESTION: 9

The reduction in project time normally results in

Solution:
QUESTION: 10

Economic saving of time results by crashing

Solution: