APPSC (Andhra Pradesh) Exam  >  APPSC (Andhra Pradesh) Tests  >  APPSC State Specific Preparation Course  >  Test: Power Resources - APPSC (Andhra Pradesh) MCQ

Test: Power Resources - APPSC (Andhra Pradesh) MCQ


Test Description

15 Questions MCQ Test APPSC State Specific Preparation Course - Test: Power Resources

Test: Power Resources for APPSC (Andhra Pradesh) 2024 is part of APPSC State Specific Preparation Course preparation. The Test: Power Resources questions and answers have been prepared according to the APPSC (Andhra Pradesh) exam syllabus.The Test: Power Resources MCQs are made for APPSC (Andhra Pradesh) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Power Resources below.
Solutions of Test: Power Resources questions in English are available as part of our APPSC State Specific Preparation Course for APPSC (Andhra Pradesh) & Test: Power Resources solutions in Hindi for APPSC State Specific Preparation Course course. Download more important topics, notes, lectures and mock test series for APPSC (Andhra Pradesh) Exam by signing up for free. Attempt Test: Power Resources | 15 questions in 15 minutes | Mock test for APPSC (Andhra Pradesh) preparation | Free important questions MCQ to study APPSC State Specific Preparation Course for APPSC (Andhra Pradesh) Exam | Download free PDF with solutions
Test: Power Resources - Question 1

What is a critical factor for the rapid advancement of agriculture, industry, and the overall economy of a state?

Detailed Solution for Test: Power Resources - Question 1
Access to reliable and affordable power is a critical factor for the rapid development of agriculture, industry, and the overall economy of a state. This is because power is essential for running machinery, equipment, and other industrial processes. Without a stable power supply, industries may face disruptions, leading to decreased productivity and economic growth. In Andhra Pradesh, significant investments have been made to enhance power generation capacity, transmission, and distribution networks to ensure a consistent and quality power supply for supporting economic activities.
Test: Power Resources - Question 2

How is the remaining power generation capacity in Andhra Pradesh utilized?

Detailed Solution for Test: Power Resources - Question 2
The remaining power generation capacity in Andhra Pradesh, which is not committed to the state through power purchase agreements, is mainly exported to neighboring states like Telangana. This export helps in optimizing the utilization of excess power generated in the state and can contribute to revenue generation through power trading arrangements with other regions.
1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Power Resources - Question 3

What measures have been undertaken in Andhra Pradesh to improve the quality of power supply?

Detailed Solution for Test: Power Resources - Question 3
In Andhra Pradesh, measures such as segregating industrial feeders and reducing losses have been implemented to improve the quality of power supply. By separating industrial feeders from other consumers and implementing strategies to minimize transmission and distribution losses, the state aims to enhance the efficiency and reliability of its power distribution network, ensuring a better quality of power supply for various sectors and consumers.
Test: Power Resources - Question 4
What percentage of the total installed utility power generation capacity in Andhra Pradesh is committed to the state through power purchase agreements?
Detailed Solution for Test: Power Resources - Question 4
Approximately 57% of the total installed utility power generation capacity in Andhra Pradesh, which amounts to nearly 20,000 MW, is committed to the state through power purchase agreements. This allocation ensures a certain portion of the generated power is reserved for meeting the state's energy needs, contributing to its overall development and growth.
Test: Power Resources - Question 5
How often do the supply timings rotate for agricultural consumers receiving three-phase power supply in rural areas?
Detailed Solution for Test: Power Resources - Question 5
The correct answer is Option C: Every 7 days. According to the details provided, agricultural consumers in rural areas typically receive seven hours of three-phase power supply in single or two spells, with the supply timings rotating every 7 days. This rotation schedule ensures equitable distribution of power among agricultural consumers.
Test: Power Resources - Question 6
Which thermal power plant in Andhra Pradesh has the highest capacity among the listed power plants?
Detailed Solution for Test: Power Resources - Question 6
The Simhadri Super Thermal Power Plant, located in Parawada (Visakhapatnam), has the highest capacity among the listed thermal power plants in Andhra Pradesh with a capacity of 2000 MW. This plant plays a significant role in electricity generation in the region.
Test: Power Resources - Question 7
What is the capacity of the Meenakshi Thermal Power Station located in Krishnapatanam, Nellore?
Detailed Solution for Test: Power Resources - Question 7
The Meenakshi Thermal Power Station situated in Krishnapatanam, Nellore, has a capacity of 300 MW. This power station contributes to the electricity generation capacity in the region and plays a role in meeting the energy requirements of the area.
Test: Power Resources - Question 8
Which power station is located in the Rayalaseema region of Andhra Pradesh?
Detailed Solution for Test: Power Resources - Question 8
Dr. Narla Tatarao Thermal Power Station is located in the Rayalaseema region of Andhra Pradesh. Established to meet the growing power demands in the state, this power station plays a crucial role in ensuring a stable electricity supply to the region.
Test: Power Resources - Question 9
Which Gas Turbine Power Plant in Andhra Pradesh has the highest power generation capacity?
Detailed Solution for Test: Power Resources - Question 9
Lanco Kondapalli Power Plant, located in Kondapalli (Krishna district), is the Gas Turbine Power Plant in Andhra Pradesh with the highest power generation capacity of 1466 MW. This plant significantly contributes to the state's electricity production and plays a vital role in meeting the energy needs of the region.
Test: Power Resources - Question 10
In which district of Andhra Pradesh is the Polavaram Hydro-Electric project located?
Detailed Solution for Test: Power Resources - Question 10
The Polavaram Hydro-Electric project is situated in the West Godavari district of Andhra Pradesh. This ambitious project aims to harness the power of water resources for electricity generation, irrigation, and overall development of the region, making it a significant infrastructure endeavor for the state.
Test: Power Resources - Question 11
Which Hydroelectric Power Plant in Andhra Pradesh is a joint project of Andhra Pradesh and Odisha?
Detailed Solution for Test: Power Resources - Question 11
The Machkund Hydroelectric Power Plant, located in Odisha, is a joint project of Andhra Pradesh and Odisha. This collaborative effort highlights the importance of interstate cooperation in harnessing hydroelectric resources for the benefit of both states, contributing to regional development and power generation.
Test: Power Resources - Question 12
What is the primary objective of the Solar Power Policy, 2015 in Andhra Pradesh?
Detailed Solution for Test: Power Resources - Question 12
The primary objective of the Solar Power Policy, 2015 in Andhra Pradesh is to address energy challenges by bolstering the solar energy sector. This policy aims to promote the use of solar power as a viable solution to energy needs, contributing to sustainability and reducing dependence on conventional energy sources.
Test: Power Resources - Question 13
Where is the NP Kunta Ultra Mega Solar Power Project located in Andhra Pradesh?
Detailed Solution for Test: Power Resources - Question 13
The NP Kunta Ultra Mega Solar Power Project is situated in Nambulapulakunta, Anantapur. This solar power project has a capacity of 250 MW and plays a significant role in the state's efforts to increase solar power generation.
Test: Power Resources - Question 14
What is the capacity of the Amruth Solar Power Plant in Kadiri, Anantapur?
Detailed Solution for Test: Power Resources - Question 14
The Amruth Solar Power Plant located in Kadiri, Anantapur, has a capacity of generating 1 MW of power. Despite its smaller size compared to other solar power projects, its contribution to renewable energy production is noteworthy.
Test: Power Resources - Question 15
What is the primary goal of the Andhra Pradesh Wind Power Policy 2015?
Detailed Solution for Test: Power Resources - Question 15
The primary goal of the Andhra Pradesh Wind Power Policy 2015 is to attract investments, especially from the private sector, and establish significant wind projects in the state. This policy aims to bolster wind energy generation and targets an additional 4000 MW capacity through wind power in the next five years. By offering incentives for projects commissioned under this policy, the state aims to encourage growth in the wind power sector and increase renewable energy production.
128 docs|94 tests
Information about Test: Power Resources Page
In this test you can find the Exam questions for Test: Power Resources solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Power Resources, EduRev gives you an ample number of Online tests for practice

Top Courses for APPSC (Andhra Pradesh)

Download as PDF

Top Courses for APPSC (Andhra Pradesh)