Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE) PDF Download

Surveying (Part 14)

ELECTRONIC DISTANCE MEASUREMENT (E.D.H)
Electonic distance measuring instrument or electromagnetic distance measuring instrument (called E.D.M. instrument) have been recently developed which give a very high accuracy in distance measurement. An accuracy of 1 in 105 can be achieved  without much difficulty for sights upto 100 k. These methods are extremely useful for indirect measurement of distance over difficult terrains and where a high accuracy is erquired, e.g. base line measurement in triangulation, trilateration and precies traverse.

  • The electonics distance measuring instruments can be broad classified into 3-types
    1. Light waves instruments
    2. Infra-red waves instruments
    3. Micro waves instruments The basic theory of all the three types is eassentially the same Electromagnetic waves
  • The electromagnetic waves require no medium, and they can travel even in vaccum
  • The velocity of light in vaccum = 3×108 n/s 
  • The ratio of the velocity of electromagnetic waves in vaccum to that in atmosphere is called the refractive index ratio (n)
    Thus  n=C/V
    or V=C/n

The value of the refractive index ratio (n) is greater than unity. It depends on air temperature, atmospheric condition and relative humidity.
The quantity Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)  is called the phase angle or simply phase of the motion.
At point B phase angle is 90º At point c, 180º and at D = 270º, at E phase angle is 360º. As the cycle repeates after E, the phase angle at E may not be taken as 0º.
The distance travelled by the wave corresponding to different values of the phase angles are :

Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)
Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

As the cycle repreated after f = 360º, the total distance travelled can be represented as where D = na + d n = number of completed waves d = part of the wave The port of the wave d can be written in terms of the wave length (l) if the phase angle f is known.
Because angle of 360º corresponding to one year length (l)

Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)
Thus Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Units 

  • The wave length is measured in metres (m)
  • The frequency is measured in hertz (Hz) which corresponds to a frequency of 1 cycle per second.
  • The unit of time is second (s).

(c) If n is the number of observations of an angle and V is the residual error i.e. differences between the mean observed value of the angle and its observation value, then weigth of the observation of the angle is given by
Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)
 This rule is known as Gauss’s rule.

Figure adjustment Determination of the most probable value of the angles of any geometrical figure into fulfill the geometerical conditions. is known as the figure adjustments. The geometrical figures generally used in a triangulation system are the following.
(i) Triangles
(ii) Quadrilaterals
(iii) centred polygons

Triangle adjustment: The distribution a triangular error may be mae by one of the following rules:

(a) If the angles of the triangles are of equal wights, then distribute the triangular error equally among the three angles

(b) If the angles of the triangle are of unequal weight distribute, then the triangular error among the three angles inversely to their respective weights.

Correction of angle

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Correction of angle 

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Correction of angle 

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Correction of angle 

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

(iii) Part horizon having individual and combined angles.

The probable error of a quantity which os a function of a observed quantity is obtained by multiplying the probable error of the observed quantity by the differentiation of the quantity with respect to the observed quantity.
Let x = observed quantity with ex p.e.
y = observed quantity with ey p.e.
and y = f (x)
then 

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

(E) The probable error of the quantity which as a function of more than two observed quantities is equal to the square of the summation of the squares of the probable errors of observed quantity multiplied by its differentiation with respect to quantity.
Let x1, x2, x3 -------- xn be the observed quantities
y = computed quantity
y = f (x1, x2, x3.......xn) Then

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

whose ex1 , ex2 , ex..... exx are the problem error of the  observed quantities and ey is the probable error of the computed quantity.

Triangulation Adjustment The adjustment of triangulation is generally carried out two steps:

(a) Station adjustment
(b) Figure adjustment

Probable error While determining the probable error of observation the following cases may arise

(A) Direct observation of equal weights
(a) The probable error of single observations of unit weight
(b) The probable error of any observation of wieght,

(c) The probable erro fo arithmetic mean observation
(B) Direct observations of unequal weights
(C) Computed quantities

(A) Direct observations of equal weights

(a) The probable error of single observation weight unit of may be calculated from the following formula.

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

where Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

V = Residual errors = observed value of the quantity – probable value of the quantity

n = total number of observations

(b) The probable error of any observation of weight, we  may be calculated from the following formula.

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Station Adjustment. Depending upon the method of obsevation the following the cases may arise.

(i) A close horizon with angles of equal weights
(ii) A close horizon with angles of unequal weights.
(iii) Part horizon with angles observed individually and also in combination.

(i) Closed horizon with angles of equal weights.
Let a, b, g and d be the observed angles of  To get the most probable values of the angles the error of closure is distributed equally
(ii) Closed horizon with angles of unequal wts.
In this case, the error of closure is distributed among the angles inversely as their weights.
Let e be the closure error

 Correction of angle

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Correction of angle

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Correction of angle

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

(B) Conditioned quantities

When the observation are a combination of observation equations, and conditioned equation the M.P.Vs may be obtained by the following method.

(1) By avoiding the conditioned equation and forming the normal equations of the unknowns.
(2) By avoiding the observation equations and finding the values of unknown by the correlated.

1. Method of Normal equation

2. Method of difference : Let k1, k2, k3 .... be the most probable corrections to the observed angle A, B, C.
The most probable values of A, B and C are A = observed value +k1
B = observed value + k2
C = observed value + k3

so k1, k2, k3 be the residual error \ Residual error = M.P.V. – observed value

(C) Methods of correlates.
Direct observations of unequal weight

(a) The probable error of a single observation of unit wt.

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

(b) The probable error of anyf observation of weight w

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

(c) The probable error of weighted arithematic mean

 Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

where, n = number of observations w = weight of an observation Iw = sum of the weights Iwr2 = sum of the weighted squares of the residual

(3) The computed quantities. 

The probable errors of computed quantities may be calculated by the following laws

(a) The probable error of any computed quantities which is either the sum or the difference of the observed quantities plus or minus a constant is always the same as that of observed quantity.
(b) The probable error of the multiple of the observed quantity and a constant is obtained by multiplying the computed quantity by the same constant.
(c) The probable error of the sum of the observed quantities is equal to the square root of the sum of the squares of the probable errors in the observed quantities.

Weight of an observation The relative precision and trust worthiness of an observation as compared to the precision of other quantities is known as weight of the observations. It is always expressd in number. The higher number indicates higher precision as compared to lower number.

The document Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE) is a part of the Civil Engineering (CE) Course Civil Engineering SSC JE (Technical).
All you need of Civil Engineering (CE) at this link: Civil Engineering (CE)
2 videos|122 docs|55 tests

Top Courses for Civil Engineering (CE)

FAQs on Electonic Distance Measurement - Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

1. What is electronic distance measurement in civil engineering?
Ans. Electronic distance measurement (EDM) is a technique used in civil engineering to measure distances accurately. It involves the use of electronic devices, such as total stations or laser rangefinders, which emit a beam or signal to determine the distance between two points. This method is commonly used for surveying, construction, and mapping purposes.
2. How does electronic distance measurement work?
Ans. Electronic distance measurement works by emitting a beam or signal from a device to a target point and measuring the time it takes for the beam or signal to travel back to the device. By knowing the speed at which the beam or signal travels, the device can calculate the distance based on the time it took for the round trip. This distance measurement is highly accurate and can be used for various applications in civil engineering.
3. What are the advantages of electronic distance measurement in civil engineering?
Ans. Electronic distance measurement offers several advantages in civil engineering. Firstly, it provides high accuracy and precision, allowing engineers to obtain reliable measurements for their projects. Secondly, EDM devices are portable and easy to use, making them convenient for fieldwork. Additionally, electronic distance measurement is faster compared to traditional surveying methods, saving time and increasing productivity. Lastly, it allows for real-time data collection, improving efficiency in construction and surveying processes.
4. Are there any limitations to electronic distance measurement in civil engineering?
Ans. While electronic distance measurement is a widely used and reliable technique, it does have some limitations. One limitation is that it requires a clear line of sight between the device and the target point. Obstacles such as trees, buildings, or rough terrain can obstruct the beam or signal, making accurate measurements difficult. Additionally, adverse weather conditions such as heavy rain, fog, or extreme temperatures can affect the accuracy of the measurements. It is important for civil engineers to consider these limitations and choose appropriate measurement methods accordingly.
5. What are some common applications of electronic distance measurement in civil engineering?
Ans. Electronic distance measurement has various applications in civil engineering. It is commonly used in surveying to measure distances between points for mapping, land development, and road construction. It is also employed in setting out building foundations, aligning structural components, and monitoring structural deformations. Furthermore, electronic distance measurement plays a crucial role in topographic surveys, hydrographic surveys, and geodetic measurements. Its versatility and accuracy make it an essential tool for many civil engineering projects.
2 videos|122 docs|55 tests
Download as PDF
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev
Related Searches

Extra Questions

,

Viva Questions

,

Free

,

Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

,

Previous Year Questions with Solutions

,

mock tests for examination

,

MCQs

,

Exam

,

shortcuts and tricks

,

Semester Notes

,

practice quizzes

,

video lectures

,

ppt

,

past year papers

,

Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

,

Summary

,

Important questions

,

Sample Paper

,

Electonic Distance Measurement | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

,

Objective type Questions

,

study material

,

pdf

;