Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE) PDF Download

Chapter 6
HYDROGRAPH
Hydrographs: Hydrograph is a response of a given catchment to a rainfall input.

 Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Components:
MA= base flow recession, AB= Rising limb, BC= crest segment, CD= falling limb, DN= base flow recession

UNIT HYDROGRAPH:
Unit hydrograph is defined as the hydrograph of direct runoff resulting from 1 unit depth (1cm) of rainfall excess occurring uniformly over the basin and at a uniform rate for a specified duration (D-hours). This called D-hour unit hydrograph.

 Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Two basic assumptions of unit hydrograph theory:
1. Time  invariance: The  direct  run-off  response  to  a  given  effective  rainfall  in  a catchment is time variant. This implies that the DRH for a given ER in a catchment is always the same irrespective of when it occurs.

2. Linear response: The direct run-off response to the rainfall excess is assumed to be linear. It means that if an input x1 (t)  and causes an output y1(t )and an input x2(t ) causes an output y2 (t), then  input x1(t) + x2(t) gives an output y1(t) + y2 (t).

Application of unit hydrograph: By using unit hydrograph one can easily calculate the DRH. Let it to be assumed that a D-h unit hydrograph and the storm hyetograph are available.
The initial and infiltration losses are estimated and deducted from the storm hyetograph to obtain the ERH. The ERH is then divided into M blocks of D-h duration each. The rainfall excess in each D-h duration is then operated upon the unit hydrograph successively to get the various DRH curves. The ordinates of these DRH’s are suitably lagged to obtain the proper time sequence and are then collected and added at each time to obtain the required net DRH due to the storm

Deviation of unit hydrographs:

1. Method of superposition: If a D h unit hydrograph is available and it is desired to develop a unit hydrograph of nD h where n is an integer, it is easily accomplished by superposing n unit hydrographs with each graph separated from pervious on by D h. The combination of these curves gives n cm rainfall excess. By dividing with n we get nD h unit hydrograph.

2. The S-curve technique: If it is desired to develop a unit hydrograph of duration mD,where m is a fraction, the method of superposition cannot be used. This can be achieved by S-curve. The S-curve, also known as S-hydrograph is a hydrograph produced by a continuous effective rainfall at constant rate for an infinite period. It is a curve obtained by summation of an infinite series of D-h unit hydrographs spaced D hour apart. At any given time the ordinates of the various curves occurring at that time  co-ordinates are summed up to obtain ordinates of S-curve. This S-curve is due to a D-h unit hydrograph. It has a initial steep portion and reaches a maximum equilibrium discharge at a time equal to the time base of the first unit hydrograph. The average intensity of ER producing the S-curve is 1/D cm /h and the equilibrium discharge

 Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)
Where A= Area of catchment in km2 D= Duration in hours of ER at the unit hydrograph

Derivation of T-hour unit hydrograph: Consider two D-h S-curves A and B displaced T-h. If the ordinates of B are subtracted from that A, the resulting curve is a DRH produced by a rainfall excess of duration T- h and magnitude

 Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)cm.  
Hence,  if the ordinate  differences  of A and  B i.e. (SA -SB ) are divided by DT , the resulting ordinates denote a hydrograph due to an ER of 1cm and of duration T-h, i.e. a T-h unit hydrograph.

PROBABILITY:
If the probability of an event occurring is P, The probability of the event not occurring is q = 1 - P.
The probability of occurrence of the event r times in n successive years is
pr,n = ncr pr. qn-r 
The probability of the event not occurring at all in n successive years is
Po,n = nco po. qn-0 = qn

The probability of the event occurring at least once in a successive years P1 = 1-qn.

The probable maximum precipitation (PMP): It is defined as the greatest or extreme rainfall for a given duration that is physically possible over a station or basin.
Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE) 
Where,K = Precipitation factor.

Evapotranspiration: Evaporation  from  water  bodies  and  soil masses  together  with transpiration from vegetation is known as Evapotranspiration.

Evaporimeters: To estimate the evaporation, evaporimeters are used.

Types of Evaporimeters:
1. Class A evaporation pan
2. ISI standard pan Lake evaporation = Cp ×pan evaporation where Cp = pan coefficient

Transpiration: Transpiration is the process by which water leaves the body of a living plant and reaches atmosphere as water vapour.
Evapotranspiration is measured by Lysimeter.

Evapotranspiration equation: 
Penman’s equation: PET= Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

Where,
PET= daily potential Evapotranspiration mm/ day
A= slope of saturation vapour pressure temperature curve
Hn= net radiation in mm of evaporable water/ day
Ea = parameters of wind velocity and saturation deficit.
 g = constant

Isopleth: The lines on a map through places having equal depths of transpiration are called depth.
Infiltration: Infiltration is the flow of water into the ground through the soil surface. Infiltration capacity:

Horton’s equation:
He observed that the infiltration capacity reduced in an exponential fashion from an initial, maximum rate fcf to a final constant rate fco. Horton expressed the decay of infiltration capacity with time as an exponential decay given by
f = fc + (fo - fc ) e-kt

Where,
f = infiltration capacity at any time t from the start of the rainfall
fo = initial infiltration capacity at t = 0
fc = final steady state value
td = Duration of rainfall
kh = constant depending on soil.  

φ -Index : The  φ- index is the average rainfall above which the rainfall volume is equal to the runoff vol.The φ index is derived from the rainfall hyetograph with the edge of the resulting run- off volume.
φ -Index=(I-R)/24
Where,
R = Runoff in cm from a 24- h rainfall of intensity I cm/day

Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

W - index :
  Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)
P = total storm precipitation
R = total run-off
Ia = initial losses
te = duration of rainfall excess.

Stream flow measurement:
1. Area-velocity method:   Q=A.V
2. Dilution technique
3. Ultrasonic method
4. Indirect method
5. Hydraulic structures
6. Slope area method

The document Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE) is a part of the Civil Engineering (CE) Course Civil Engineering SSC JE (Technical).
All you need of Civil Engineering (CE) at this link: Civil Engineering (CE)
2 videos|122 docs|55 tests

Top Courses for Civil Engineering (CE)

FAQs on Hydrographs - Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

1. What is a hydrograph in civil engineering?
Ans. A hydrograph in civil engineering is a graph that shows the variation in the flow rate of a river or stream over a specific period of time. It is commonly used to study and analyze the behavior of water levels in rivers, especially during rainfall events.
2. How is a hydrograph useful in civil engineering projects?
Ans. A hydrograph is useful in civil engineering projects as it provides crucial information about the flow of water in rivers or streams. This information helps engineers in designing bridges, dams, flood control measures, and other infrastructure projects that are directly or indirectly affected by water levels.
3. What are the components of a hydrograph?
Ans. A hydrograph typically has two main components: the rising limb and the falling limb. The rising limb represents the increase in flow rate as a result of rainfall or other factors, while the falling limb represents the decrease in flow rate after the rainfall event has ended. Other components may include the base flow, which is the normal flow rate of the river, and the peak flow, which is the highest flow rate observed during the event.
4. How is a hydrograph created and analyzed?
Ans. A hydrograph is created by collecting data on the flow rate of a river or stream at regular intervals over a specific period of time. This data is then plotted on a graph, with time on the x-axis and flow rate on the y-axis. The graph is then analyzed to identify the different components of the hydrograph, such as the rising and falling limbs, and to calculate important parameters like the time to peak and the peak flow rate.
5. What are the applications of hydrographs in civil engineering?
Ans. Hydrographs have various applications in civil engineering. They are used to assess flood risk, design drainage systems, determine the capacity of reservoirs, evaluate the effectiveness of flood control measures, and analyze the impact of land use changes on water levels. Hydrographs also help in predicting and managing water resources, especially in areas prone to droughts or water scarcity.
2 videos|122 docs|55 tests
Download as PDF
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev
Related Searches

Previous Year Questions with Solutions

,

Viva Questions

,

Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

,

Important questions

,

study material

,

pdf

,

Sample Paper

,

MCQs

,

Semester Notes

,

Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

,

Exam

,

mock tests for examination

,

video lectures

,

shortcuts and tricks

,

Objective type Questions

,

practice quizzes

,

ppt

,

Extra Questions

,

Summary

,

Hydrographs | Civil Engineering SSC JE (Technical) - Civil Engineering (CE)

,

past year papers

,

Free

;