Valuation of Work-In-Progress

Meaning of Work-in-Progress:

Since in process industries, production is continuous, there may be some incomplete production at the end of an accounting period. Incomplete units mean those units on which percentage of completion with regular to all elements of cost (i.e. material, labour and overhead) is not 100%. Such incomplete production units are known as Work-in-Progress. Such Work-in-Progress is valued in terms of equivalent or effective production units.

Meaning of Equivalent Production Units:

This represents the production of a process in terms of complete units. In other words, it means converting the incomplete production into its equivalent of complete units. The term equivalent unit means a notional quantity of completed units substituted for an actual quantity of incomplete physical units in progress, when the aggregate work content of the incomplete units is deemed to be equivalent to that of the substituted quantity. The principle applies when operation costs are apportioned between work in progress and completed units.

Equivalent units of work in progress = Actual no. of units in progress x Percentage of work completed

Equivalent unit should be calculated separately for each element of cost (viz. material, labour and overheads) because the percentage of completion of the different cost component may be different.

Accounting Procedure:

The following procedure is followed when there is Work-in- Progress

  1. Find out equivalent production after taking into account of the process losses, degree of completion of opening and / or closing stock.
  2. Find out net process cost according to elements of costs i.e. material, labour and overheads.
  3. Ascertain cost per unit of equivalent production of each element of cost separately by dividing each element of costs by respective equivalent production units.
  4. Evaluate the cost of output finished and transferred work in progress

The total cost per unit of equivalent units will be equal to the total cost divided by effective units and cost of work-in progress will be equal to the equivalent units of work-in progress multiply by the cost per unit of effective production.

In short the following from steps an involved.

Step 1 – prepare statement of Equivalent production

Step 2 – Prepare statement of cost per Equivalent unit

Step 3 – Prepare of Evaluation

Step 4 – Prepare process account

The problem on equivalent production may be divided into four groups.

I. When there is only closing work-in-progress but without process losses

II. When there is only closing work-in-progress but with process losses

III. When there is only opening as well as closing work-in progress without process losses

IV. When there is opening as well as closing work-in progress with process losses

Situation I: Only closing work-in-progress without process losses:

In this case, the existence of process loss is ignored. Closing work-in-progress is converted into equivalent units on the basis of estimates on degree of completion of materials, labour and production overhead. Afterwards, the cost pr equivalent unit is calculated and the same is used to value the finished output transferred and the closing work-in-progress

Situation II: When there is closing work-in-progress with process loss or gain.

If there are process losses the treatment is same as already discussed in this chapter. In case of normal loss nothing should be added to equivalent production. If abnormal loss is there, it should be considered as good units completed during the period. If units scrapped (normal loss) have any reliable value, the amount should be deducted from the cost of materials in the cost statement before dividing by equivalent production units. Abnormal gain will be deducted to obtain equivalent production.

Situation III: Opening and closing work-in-progress without process losses.

Since the production is a continuous activity there is possibility of opening as well as closing work-inprogress. The procedure of conversion of opening work-in-progress will vary depending on the method of apportionment of cost followed viz, FIFO, Average cost Method and LIFO. Let us discuss the methods of valuation of work-in-progress one by one.

(a) FIFO Method: The FIFO method of costing is based on the assumption of that the opening work-in-progress units are the first to be completed. Equivalent production of opening work-in-progress can be calculated as follows:

Equivalent Production = Units of Opening WIP x Percentage of work needed to finish the units

(b) Average Cost Method: This method is useful when price fluctuate from period to period. The closing valuation of work-in-progress in the old period is added to the cost of new period and an average rate obtained. In calculating the equivalent production opening units will not be shown separately as units of work-in-progress but included in the units completed and transferred.

(c) Weighted Average Cost Method: In this method no distinction is made between completed units from opening inventory and completed units from new production. All units finished during the current accounting period are treated as if they were started and finished during that period. The weighted average cost per unit is determined by dividing the total cost (opening work-in-progress cost + current cost) by equivalent production.

(d) LIFO Method: In LIFO method the assumption is that the units entering into the process is the last one first to be completed. The cost of opening work-in-progress is charged to the closing work-inprogress and thus the closing work-in progress appears cost of opening work-in-progress. The completed units are at their current cost.

Format of statement of Equivalent Production

Input

 

Output

 

Equivalent Production

 

Particulars

Units

Particulars

Units

 

Material                    Labour

Overhead

 

 

 

 

 

%            Units         %         Units

%         Units

Opening

XX

Units

XX

XX

XX              XX              XX

 

Stock

 

completed

 

 

 

 

Units

XX

Normal

XX

 

 

 

introduced

XX

Loss

Abnormal

Loss

XX

XX

XX              XX              XX

 

 

 

Equivalent

units

XX

XX

XX              XX              XX

XX              XX

Statement of Cost per Equivalent units

Elements of Costing

Cost in Rs

Equivalent Units

Cost per equivalent Units in Rs

Material Cost

XX

XX

XX

Labour Cost

XX

XX

XX

Overhead Cost

XX

XX

XX

Statement of Evaluation 

Particulars

Element of

Cost

Equivalent

Units

Cost per equivalent units in Rs

Cost in Rs

Total Cost in Rs

Units Completed

Material

XX

XX

XX

XX

 

Labour

XX

XX

XX

XX

 

Overhead

XX

XX

XX

XX

Closing WIP

Material

XX

XX

XX

XX

 LabourXXXXXXXX
 OverheadXXXXXXXX
Abnormal LossMaterialXXXXXXXX
 LabourXXXXXXXX
 OverheadXXXXXXXX
The document Valuation of Work-in-progress - Methods of Costing, Cost Accounting | Cost Accounting - B Com is a part of the B Com Course Cost Accounting.
All you need of B Com at this link: B Com
106 videos|173 docs|18 tests

FAQs on Valuation of Work-in-progress - Methods of Costing, Cost Accounting - Cost Accounting - B Com

1. What is work-in-progress valuation?
Ans. Work-in-progress valuation refers to the process of determining the value of partially completed goods or services that are still in the production process. It involves assigning costs to the various stages of production and calculating the value of the work-in-progress inventory at a particular point in time.
2. What are the different methods of costing used for work-in-progress valuation?
Ans. There are several methods of costing used for work-in-progress valuation, including: 1. Weighted Average Cost Method: This method calculates the average cost of production by dividing the total cost of production by the total number of units produced. 2. FIFO (First-In, First-Out) Method: This method assumes that the units produced or purchased first are the first ones to be sold or completed. The cost of the oldest units is assigned to the units completed first. 3. LIFO (Last-In, First-Out) Method: This method assumes that the units produced or purchased last are the first ones to be sold or completed. The cost of the most recent units is assigned to the units completed first. 4. Standard Costing Method: This method uses predetermined standard costs for materials, labor, and overheads. The work-in-progress valuation is based on the standard costs multiplied by the actual quantities used. 5. Specific Identification Method: This method individually identifies and assigns the actual cost of each item of work-in-progress. It is typically used for high-value or unique items.
3. How does the weighted average cost method work for work-in-progress valuation?
Ans. The weighted average cost method calculates the average cost of production by dividing the total cost of production by the total number of units produced. The formula for calculating the weighted average cost per unit is: Weighted Average Cost per Unit = Total Cost of Production / Total Number of Units Produced This method is commonly used when it is difficult to distinguish between different batches of production or when there is a constant flow of production. It provides a simple and straightforward way to allocate costs to work-in-progress inventory.
4. What are the advantages of using the FIFO method for work-in-progress valuation?
Ans. The FIFO (First-In, First-Out) method has several advantages for work-in-progress valuation: 1. Realistic Cost Allocation: FIFO assumes that the oldest units are completed first, which generally reflects the actual flow of production. This results in a more realistic allocation of costs to work-in-progress inventory. 2. Accurate Profit Calculation: Since the costs assigned to completed units are based on older, lower-cost materials, the FIFO method often leads to a more accurate calculation of profit. This is especially true when there are significant cost fluctuations. 3. Tax Benefits: FIFO can provide tax advantages in situations where costs are increasing over time. By assigning lower-cost materials to completed units, the value of work-in-progress inventory and taxable income can be lower.
5. What are the main differences between the LIFO and FIFO methods for work-in-progress valuation?
Ans. The main differences between the LIFO (Last-In, First-Out) and FIFO (First-In, First-Out) methods for work-in-progress valuation are: 1. Cost Allocation: LIFO assumes that the most recent units are completed first, while FIFO assumes that the oldest units are completed first. This leads to different cost allocations for work-in-progress inventory. 2. Profit Calculation: LIFO often results in a lower reported profit compared to FIFO, especially during periods of rising costs. This is because the cost of the most recent units, which are usually higher, is assigned to completed units. 3. Tax Implications: LIFO can provide tax advantages in situations where costs are increasing over time. By assigning higher-cost materials to completed units, the value of work-in-progress inventory and taxable income can be lower. 4. Inventory Valuation: The value of work-in-progress inventory under LIFO is usually lower than under FIFO, as LIFO assigns higher-cost materials to completed units. This can impact financial statements and inventory management decisions.
106 videos|173 docs|18 tests
Download as PDF
Explore Courses for B Com exam
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev
Related Searches

mock tests for examination

,

MCQs

,

practice quizzes

,

Semester Notes

,

Extra Questions

,

Important questions

,

Free

,

Valuation of Work-in-progress - Methods of Costing

,

study material

,

Cost Accounting | Cost Accounting - B Com

,

Sample Paper

,

Valuation of Work-in-progress - Methods of Costing

,

Summary

,

Cost Accounting | Cost Accounting - B Com

,

Viva Questions

,

pdf

,

video lectures

,

Valuation of Work-in-progress - Methods of Costing

,

shortcuts and tricks

,

Exam

,

Previous Year Questions with Solutions

,

Objective type Questions

,

past year papers

,

Cost Accounting | Cost Accounting - B Com

,

ppt

;