Planning the production in advance comes under production, planning, and control. Setting the exact route of each item and fixing the starting and finishing date for each item is the key operation. Giving the production orders to different shops and observing the progress of products according to order.
A systematic view of the various functions of the PPC departments are written as follows:
Aggregate planning is the planning for an intermediate range of time.
Aggregate planning is classified in two types i.e.
A transformation system in which a saleable product or service is created by working upon a set of inputs is known as a production system. Generally the inputs are in the form of men, machine, money, materials etc.
They are broadly classified into three categories:
Classification of production systems are done based on the following types:
In Job production, products are made to satisfy a particular order. However, that order may be produced-only once
The following are some of the important characteristics of job shop type production system:
The manufacturing of a number of identical articles either to meet a specific order or to meet a continuous demand is called batch production. Batch can be manufactured either-
The following are some of the important characteristics of a batch type production system:
To meet the continuous demand of the product, the same type of product is manufactured in mass production. Usually, the demand of the product is very high and the market is going to sustain the same demand for a sufficiently long time.
The following are some of the important characteristics of a mass production system:
30 videos|40 docs|30 tests
|
1. What is production planning and control in mechanical engineering? |
2. What are the key objectives of production planning and control in mechanical engineering? |
3. What are the main components of production planning and control in mechanical engineering? |
4. How does production planning and control contribute to cost reduction in mechanical engineering? |
5. What are the challenges faced in production planning and control in mechanical engineering? |
|
Explore Courses for Mechanical Engineering exam
|