CUET Commerce Exam  >  CUET Commerce Test  >  General Test Preparation for CUET UG  >  Test: Arun Sharma Based Level 3: Time & Work - CUET Commerce MCQ

Arun Sharma Based Level 3: Time & Work - Free MCQ Practice Test with solutions,


MCQ Practice Test & Solutions: Test: Arun Sharma Based Level 3: Time & Work (30 Questions)

You can prepare effectively for CUET Commerce General Test Preparation for CUET UG with this dedicated MCQ Practice Test (available with solutions) on the important topic of "Test: Arun Sharma Based Level 3: Time & Work". These 30 questions have been designed by the experts with the latest curriculum of CUET Commerce 2026, to help you master the concept.

Test Highlights:

  • - Format: Multiple Choice Questions (MCQ)
  • - Duration: 25 minutes
  • - Number of Questions: 30

Sign up on EduRev for free to attempt this test and track your preparation progress.

Test: Arun Sharma Based Level 3: Time & Work - Question 1

A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

Detailed Solution: Question 1

► A can do work in 15 days therefore amount of work done by A in 1 day is 60/15 = 4 units
► B can do work in 15 days therefore amount of work done by A in 1 day is 60/20 = 3 units
► Total amount of work done in 1 day = A work of 1 day + B's work of 1 day = 4 units + 3 units = 7 units
► Amount of work done in 4 days = 4*7 = 28 units
Amount of Work Left = 60 - 28 = 32 units
► Fraction of work left = Amount of work left/ Total Work = 32/60 
⇒ 8/15.

Test: Arun Sharma Based Level 3: Time & Work - Question 2

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

Detailed Solution: Question 2

(A + B + C)'s 1 day's work = 1/4
A's 1 day's work = 1/16
B's 1 day's work = 1/12
∴ C's 1 day's work = 1/4 - (1/16 + 1/12) = 1/4 - 7/48 = 5/48
So, C alone can do the work in 48/5 days

Test: Arun Sharma Based Level 3: Time & Work - Question 3

A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

Detailed Solution: Question 3

A's 2 day's work = 1/20 x 2 = 1/10
(A + B + C)'s 1 day's work = (1/20 + 1/30 + 1/60) = 6/60 = 1/10
Work done in 3 days = 1/10 + 1/10 = 1/5
Now, 1/5 work is done in 3 days.
∴ Whole work will be done in (3 x 5) = 15 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 4

A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:

Detailed Solution: Question 4

► Ratio of times taken by A and B = 1 : 3.
► The time difference is (3 - 1) 2 days while B take 3 days and A takes 1 day.
► If difference of time is 2 days, B takes 3 days.
► If difference of time is 60 days, B takes 3/2 x 60 = 90 days.
► So, A takes 30 days to do the work.
A's 1 day's work = 1/30
B's 1 day's work = 1/90
(A + B)'s 1 day's work = 1/30 + 1/90 = 4/90 = 2/45
∴ A and B together can do the work in 45/2 = 22.5 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 5

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

Detailed Solution: Question 5

C's 1 day's work = 1/3 - (1/6 + 1/8)
⇒ 1/3 - 7/24
⇒ 1/24
A's wages : B's wages : C's wages = 1/6 : 1/8 : 1/24
⇒ 4 : 3 : 1
C's share (for 3 days) = Rs.(3 * 1/24 * 3200)
⇒ Rs. 400

Test: Arun Sharma Based Level 3: Time & Work - Question 6

If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:

Detailed Solution: Question 6

► Let 1 man's 1 day's work = x and 1 boy's 1 day's work = y.
► Then, 6x + 8y = 1/10 and 26x + 48y = 1/2
Solving these two equations, we get :
x = 1/100 and y = 1/200
(15 men + 20 boy)'s 1 day's work = 15/100 + 20/200 = 1/4
∴ 15 men and 20 boys can do the work in 4 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 7

A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it?

Detailed Solution: Question 7

 A’s 1 hour work = 1/4
(B + C)’s 1 hour work = 1/3
(C + A)’s 1 hour work = 1/2
(A + B + C)’s 1 hour work = 1/4 + 1/3 =7/12
B’s 1 hour work = 7/12 - 1/2 = 1/12
B alone can do a piece of work in 12 hours.

Test: Arun Sharma Based Level 3: Time & Work - Question 8

A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in:

Detailed Solution: Question 8

► Let a, b and c be the fraction of work per day by A,B & C respectively.
c = 1/50
a + b = 1/10 = 5/50 .
a = b + c.
Therefore,
⇒ 2b + c = 5/50
⇒ 2b = 5/50 - 1/50 = 2/25
⇒ b = 1/25
B will do it in 25 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 9

A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?

Detailed Solution: Question 9

Whole work is done by A in 20 x 5/4 = 25 days.
Now,(1 - 4/5) i.e., 1/5 work is done by A and B in 3 days.
Whole work will be done by A and B in (3 x 5) = 15 days.
A's 1 day's work = 1/25, (A + B)'s 1 day's work = 1/15
∴ B's 1 day's work = 1/15 - 1/25 = 4/150 = 2/75
So, B alone would do the work in 75/2 = 37.5 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 10

A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 A.M. while machine P is closed at 11 A.M. and the remaining two machines complete work. Approximately at what time will the work (to print one lakh books) be finished ?

Detailed Solution: Question 10

(P + Q + R)'s 1 hour's work = 1/8 + 1/10 + 1/12 = 37/120
Work done by P, Q and R in 2 hours = 37/120 x 2 = 37/60
Remaining work = 1 - 37/60 = 23/60
(Q + R)'s 1 hour's work = 1/10 + 1/12 = 11/60
Now, 11/60 work is done by Q and R in 1 hour.
So, 23/60 work will be done by Q and R in 60/11 x 23/60 = 23/11 hours ≌ 2 hours.
So, the work will be finished approximately 2 hours after 11 A.M., i.e., around 1 P.M.

Test: Arun Sharma Based Level 3: Time & Work - Question 11

A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work?

Detailed Solution: Question 11

► A can finish work in 18 days. It means A can do the work in one day=  1 / 18 part 
► B can finish work in 15 days. It means B can do the work in one day = 1 / 15 part 
► B worked alone for 10 days and then left the job. Thus in 10 days B has completed part of work 
(1 / 15)*10 = 10 / 15 part  or  2 / 3 part of work. 
Remaining work left = ( 1- 2 / 3 ) 
⇒  1 / 3 part of work remaining 
► A can do 1 / 18 part of work in one day. Therefore, 1 / 3 part will be completed by him 
⇒ (1 / 1/18)* 1/3
⇒ 1 /3 * 18 / 1
⇒ 18 / 3 days 
⇒ 6 days
( A alone will complete the work in 6 days)

Test: Arun Sharma Based Level 3: Time & Work - Question 12

4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it?

Detailed Solution: Question 12

Let 1 man's 1 day's work = x and 1 woman's 1 day's work = y.

Solving the two equations, we get. 
∴ 1 woman's 1 day's work 
⇒ 10 women's 1 day's work 
Hence. 10 women will complete the work in 40 days

Test: Arun Sharma Based Level 3: Time & Work - Question 13

A and B can together finish a work 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days A alone can finish the work?

Detailed Solution: Question 13

(A + B)'s 20 day's work = 1/30 x 20 = 2/3
Remaining work =1 - 2/3 = 1/3
Now, 1/3 work is done by A in 20 days.
Therefore, the whole work will be done by A in (20 x 3) = 60 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 14

P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?

Detailed Solution: Question 14

P can complete the work in (12 x 8) hrs. = 96 hrs.
Q can complete the work in (8 x 10) hrs. = 80 hrs.
∴ P's 1 hour's work = 1/96 and Q's 1 hour's work = 1/80
(P + Q)'s 1 hour's work = 1/96 + 1/80 = 11/480
So, both P and Q will finish the work in 480/11 hrs.
∴ Number of days of 8 hours each = 480/11 x 1/8 = 60/11 days 

Test: Arun Sharma Based Level 3: Time & Work - Question 15

10 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?

Detailed Solution: Question 15

1 woman's 1 day's work = 1/70
1 child's 1 day's work = 1/140
(5 women + 10 children)'s day's work = 5/170 + 10/140 = 1/14 + 1/14 = 1/7
∴ 5 women and 10 children will complete the work in 7 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 16

X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?

Detailed Solution: Question 16

Work done by X in 4 days = (1/20) * 4 = 1/5
Remaining work =1 - 1/5 = 4/5
(X + Y)'s 1 day's work = 1/20 + 1/12 = 8/60 = 2/15
Now, 2/15 work is done by X and Y in 1 day.
So, 4/5 work will be done by X and Y in (15/2) * (4/5) = 6 days.
Hence, total time taken = (6 + 4) days = 10 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 17

A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days?

Detailed Solution: Question 17

► Ratio of times taken by A and B = 100 :130 = 10:13
► Suppose B takes x days to do the work
Then,10:13::23:x
⇒ x = (23×13)/10
⇒ x = 299/10
A's 1day's work = 1/23
B's 1day's work = 10/299
(A + B)'s 1 day's work = 1/23 + 10/299 = 23/299 = 1/13
∴ A and B together can complete the work in 13 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 18

Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?

Detailed Solution: Question 18

► Number of pages typed by Ravi in 1 hour = 32/6 = 16/3
► Number of pages typed by kumar in 1 hour = 40/5 = 8
► Number of pages typed by both in 1 hour = 16/3 + 8 = 40/3
∴ Time taken by both to type 110 pages = 110 x 3/40 hours
⇒ 33/4 hours or 8 hours 15 minutes

Test: Arun Sharma Based Level 3: Time & Work - Question 19

A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in:

Detailed Solution: Question 19

A’s 1 day work = 1/24
B’s 1 day work = 1/6
C’s 1 day work = 1/12
(A+B+C)’s 1 day work = 1/24 + 1/6 + 1/12 = 7/24
The work will be completed by them is 24/7 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 20

Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is:

Detailed Solution: Question 20

Ratio of times taken by Sakshi and Tanya = 125 : 100 = 5 : 4.
Suppose Tanya takes x days to do the work.
5 : 4 :: 20 : x ⇒ x = 4 * (20/5)
⇒ x = 16 days
Hence, Tanya takes 16 days to complete the work.

Test: Arun Sharma Based Level 3: Time & Work - Question 21

A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in:

Detailed Solution: Question 21

Suppose A, B and C take x, x/2 and x/3 days respectively to finish the work.
Then,1/x + 2/x + 3/x = 1/2
⇒ 6/x = 1/2
⇒ x = 12.
So, B takes (12/2) = 6 days to finish the work.

Test: Arun Sharma Based Level 3: Time & Work - Question 22

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in :

Detailed Solution: Question 22

► Let total work be 30 units (LCM of 10 and 15).
► In one day, A can do 2 units of work and B can do 3 units of work.
► In one day, both A and B can do 5 units of work.
► In two days, A and B will complete 10 units of work. Remaining 20 units can be completed by A in 10 days (at rate of 2 units per day).
► Hence, whole work will be completed in 12 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 23

A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work?

Detailed Solution: Question 23

2(A + B + C)'s 1 clay's work 
Therefore. (A + B + C)'s 1 clay's work 
Work done by A, B. C in 10 days 

Now, 1/48 work is done by A in 1 day.
So. 3/8 work will be done by A in 

Test: Arun Sharma Based Level 3: Time & Work - Question 24

A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in

Detailed Solution: Question 24

Ratio of rates of working of A and B = 2 : 1
So, ratio of time taken = 1 : 2
B's 1 day's work = 1/12
∴ A's one day work = 1/3 (2 times of B's work)
(A + B)'s 1 day's work = (1/6) + (1/12) = 3/12 = 1/4
So, A and B together can finish work in 4 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 25

Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman?

Detailed Solution: Question 25

(20 x 16) women can complete the work in 1 day.
∴ 1 woman's 1 day's work =1/320
(16 x 15) men can complete the work in 1 day.
∴ 1 man's 1 day's work = 1/240
So, required ratio = 1/240 : 1/320
⇒ 1/3 :1/4
⇒ 4 : 3 (cross multiplied)

Test: Arun Sharma Based Level 3: Time & Work - Question 26

A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in :

Detailed Solution: Question 26

(A + B + C)'s 1 day's work = 1/6
(A + B)'s 1 day's work = 1/8    
(B + C)'s 1 day's work = 1/12    
Therefore (A + C)'s 1 day's work    
⇒ (2 x 1/6) - (1/8 + 1/12)
⇒ (1/3 - 5/24)
⇒ 3/24
⇒ 1/8
So, A and C together will do the work in 8 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 27

A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in:

Detailed Solution: Question 27

(B + C)'s 1 day's work  
Work done by B and C in 3 days 
Remaining work 
Now, 1/24 work is done by A in 1 day.
So, 5/12 work is done by A in 

Test: Arun Sharma Based Level 3: Time & Work - Question 28

X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work?

Detailed Solution: Question 28

No of days taken by X to finish the work = 40
So part of work done by X in 1 day = 1/40
Part of work done by X in 8 days = 8/40 = 1/5
The remaining part = 1 - 1/5 = 4/5
No of days taken by Y to finish 4/5 part = 16
Part of work done by Y in 1 day = (4/5)/16
⇒ (4/5)(1/16)
⇒ 1/20
Part of work done by both together in 1 day = (1/40) + (1/20) = 3/40
Hence, X and Y will together complete the work in = 40/3

Test: Arun Sharma Based Level 3: Time & Work - Question 29

If A and B together can complete a piece of work in 15 days and B alone in 20 days, in how many days can A alone complete the work?

Detailed Solution: Question 29

Given, (A + B)’s 1 day’s work = 1/15
B’s 1 day’s work  = 1/20
∴ A’s 1 day’s work will be
⇒ 1/15 - 1/20
⇒ (4-3)/60
⇒ 1/60
∴ A alone will do the work in 60 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 30

A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?

Detailed Solution: Question 30

Let A's 1 day's work = x and B's 1 day's work = y.
Then, x + y = 1/30 and 16x + 44y = 1
Solving these two equations, we get: 
x = 1/60 and y = 1/60
∴ B's 1 day's work = 1/60
Hence, B alone shall finish the whole work in 60 days.

164 videos|811 docs|1353 tests
Information about Test: Arun Sharma Based Level 3: Time & Work Page
In this test you can find the Exam questions for Test: Arun Sharma Based Level 3: Time & Work solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Arun Sharma Based Level 3: Time & Work, EduRev gives you an ample number of Online tests for practice
Download as PDF