Electrical Engineering (EE) Exam  >  Electrical Engineering (EE) Tests  >  Test: Construction Of Phase Trajectories - Electrical Engineering (EE) MCQ

Test: Construction Of Phase Trajectories - Electrical Engineering (EE) MCQ


Test Description

10 Questions MCQ Test - Test: Construction Of Phase Trajectories

Test: Construction Of Phase Trajectories for Electrical Engineering (EE) 2024 is part of Electrical Engineering (EE) preparation. The Test: Construction Of Phase Trajectories questions and answers have been prepared according to the Electrical Engineering (EE) exam syllabus.The Test: Construction Of Phase Trajectories MCQs are made for Electrical Engineering (EE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Construction Of Phase Trajectories below.
Solutions of Test: Construction Of Phase Trajectories questions in English are available as part of our course for Electrical Engineering (EE) & Test: Construction Of Phase Trajectories solutions in Hindi for Electrical Engineering (EE) course. Download more important topics, notes, lectures and mock test series for Electrical Engineering (EE) Exam by signing up for free. Attempt Test: Construction Of Phase Trajectories | 10 questions in 10 minutes | Mock test for Electrical Engineering (EE) preparation | Free important questions MCQ to study for Electrical Engineering (EE) Exam | Download free PDF with solutions
Test: Construction Of Phase Trajectories - Question 1

Electrical time-constant of an armature-controlled dc servomotor is :

Detailed Solution for Test: Construction Of Phase Trajectories - Question 1

Explanation: Electrical time constant is smaller than the mechanical time constant and hence the delay in the mechanical systems is more than the electrical systems.

Test: Construction Of Phase Trajectories - Question 2

The open-loop transfer function of a unity feedback system is K/(s^2 (s+5))The system is unstable for

Detailed Solution for Test: Construction Of Phase Trajectories - Question 2

Explanation: The open loop transfer function of a unity feedback system is used to calculate the conditional stability by using the Routh Hurwitz criteria or the Root locus technique.

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Construction Of Phase Trajectories - Question 3

Peak overshoot of step-input response of an underdamped second-order system is explicitly indicative of

Detailed Solution for Test: Construction Of Phase Trajectories - Question 3

Explanation: Peak overshoot refers to the damping of the system as if the damping id less than the peak will be more.

Test: Construction Of Phase Trajectories - Question 4

A unity feedback system with open-loop transfer function G (s) = 4/[s(s+p)] is critically damped. The value of the parameter p is

Detailed Solution for Test: Construction Of Phase Trajectories - Question 4

Explanation: The value of the p can be calculated by comparing the equation with the standard characteristic equation.

Test: Construction Of Phase Trajectories - Question 5

Polar plot of G (jw) = 1/jw(jw+t) is

Detailed Solution for Test: Construction Of Phase Trajectories - Question 5

Explanation: Polar plot can be made of the following function by following appropriate steps and thus the plot neither crosses the real axis nor imaginary axis.

Test: Construction Of Phase Trajectories - Question 6

In optimum time switching curve the system takes :

Detailed Solution for Test: Construction Of Phase Trajectories - Question 6

Explanation: If switching is made to occur the crossing of the starting trajectory with the thick line trajectory the system follows the trajectory and reaches the desired output at the minimum time.

Test: Construction Of Phase Trajectories - Question 7

System with logic switching are :

Detailed Solution for Test: Construction Of Phase Trajectories - Question 7

Explanation: Suitable logic circuitry has to be added to the controller structure for the kind of the switching and such systems are known as the bang-bang control system.

Test: Construction Of Phase Trajectories - Question 8

Zeroes are defined as:

Detailed Solution for Test: Construction Of Phase Trajectories - Question 8

Explanation: Zeroes are defined as the roots of the numerator of the closed loop system.

Test: Construction Of Phase Trajectories - Question 9

As zero moves sufficiently left from the origin the effect of zero becomes less pronounced.

Detailed Solution for Test: Construction Of Phase Trajectories - Question 9

Explanation: The effect of zero on transient response will be negligible if the zero moves left from the origin due to dominant pole mechanism.

Test: Construction Of Phase Trajectories - Question 10

Assertion (A): The zeroes on the real axis near the origin are generally avoided in design.
Reason (R): In a sluggish system introduction of zeroes can improve the transient response

Detailed Solution for Test: Construction Of Phase Trajectories - Question 10

Explanation: The zeroes on the real axis near the origin are generally avoided in design as they cause system instability.

Information about Test: Construction Of Phase Trajectories Page
In this test you can find the Exam questions for Test: Construction Of Phase Trajectories solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Construction Of Phase Trajectories, EduRev gives you an ample number of Online tests for practice

Top Courses for Electrical Engineering (EE)

Download as PDF

Top Courses for Electrical Engineering (EE)