Civil Engineering (CE) Exam  >  Civil Engineering (CE) Tests  >  Test: Water Resources Engineering - 5 - Civil Engineering (CE) MCQ

Test: Water Resources Engineering - 5 - Civil Engineering (CE) MCQ


Test Description

25 Questions MCQ Test - Test: Water Resources Engineering - 5

Test: Water Resources Engineering - 5 for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Test: Water Resources Engineering - 5 questions and answers have been prepared according to the Civil Engineering (CE) exam syllabus.The Test: Water Resources Engineering - 5 MCQs are made for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Water Resources Engineering - 5 below.
Solutions of Test: Water Resources Engineering - 5 questions in English are available as part of our course for Civil Engineering (CE) & Test: Water Resources Engineering - 5 solutions in Hindi for Civil Engineering (CE) course. Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free. Attempt Test: Water Resources Engineering - 5 | 25 questions in 25 minutes | Mock test for Civil Engineering (CE) preparation | Free important questions MCQ to study for Civil Engineering (CE) Exam | Download free PDF with solutions
Test: Water Resources Engineering - 5 - Question 1

Water is useful for

Test: Water Resources Engineering - 5 - Question 2

Knowledge of hydrology is necessary for civil engineers for

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Water Resources Engineering - 5 - Question 3

Pick up the correct statement from the following :

Test: Water Resources Engineering - 5 - Question 4

Pick up the correct statement from the following :

Test: Water Resources Engineering - 5 - Question 5

Run off includes

Test: Water Resources Engineering - 5 - Question 6

Pick up the correct statement from the following :

Test: Water Resources Engineering - 5 - Question 7

A soil strata may consist of

Test: Water Resources Engineering - 5 - Question 8

Pick up the correct statement from the following :

Test: Water Resources Engineering - 5 - Question 9

If the slope of a line for infiltration capacity curve is , the value of constant k in Horton's equation of infiltration capacity curve, is

Test: Water Resources Engineering - 5 - Question 10

The equation P - Q = Te φindex for determining the infiltration capacity, was suggested by

Test: Water Resources Engineering - 5 - Question 11

Pick up the correct statement from the following :

Test: Water Resources Engineering - 5 - Question 12

Pressure exerted by fully saturated air, is known

Test: Water Resources Engineering - 5 - Question 13

A volume of air at constant barometric pressure may be brought to dew point by

Test: Water Resources Engineering - 5 - Question 14

If the dew point is greater than 0�C

Test: Water Resources Engineering - 5 - Question 15

Humidity refers to

Test: Water Resources Engineering - 5 - Question 16

Relative humidity is the ratio of actual vapour pressure to the saturation vapour pressure

Test: Water Resources Engineering - 5 - Question 17

Pick up correct statement from the following :

Test: Water Resources Engineering - 5 - Question 18

Precipitation caused due to upward movement of warmer air as compared to surrounding air, is called

Test: Water Resources Engineering - 5 - Question 19

Precipitation caused due to striking of air masses with a topographical feature, is called

Test: Water Resources Engineering - 5 - Question 20

The specifications of most commonly used standard gauges in India, are

Test: Water Resources Engineering - 5 - Question 21

Pick up the correct statement from the following :

Test: Water Resources Engineering - 5 - Question 22

The respective storm totals at three surrounding stations A, B and C are 110, 90 and 70 mm. If the normal annual precipitation amounts at stations X, A, B and C are respectively 1000, 1100, 1200 and 1250 mm, the estimated storm precipitation at X is

Test: Water Resources Engineering - 5 - Question 23

The area enclosed by the adjacent isohyets of a catchment basin are shown under :

The average depth of annual precipitation in the catchment basin will be

Test: Water Resources Engineering - 5 - Question 24

The recurrence interval (R.I.) of 20 cm rain storm at a place is 5 years.

Test: Water Resources Engineering - 5 - Question 25

Sharp crested weirs are generally used

Information about Test: Water Resources Engineering - 5 Page
In this test you can find the Exam questions for Test: Water Resources Engineering - 5 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Water Resources Engineering - 5, EduRev gives you an ample number of Online tests for practice

Top Courses for Civil Engineering (CE)

Download as PDF

Top Courses for Civil Engineering (CE)