In the network diagram shown below:
The critical path is along
Refer to the network shown in the figure given below
The probability of completion of the project in 24 days is
1 Crore+ students have signed up on EduRev. Have you? Download the App |
The activities for which total float is equal to zero are known as
The time by which as activity can be delayed without affecting the earliest start time of any other activity in a project is called
The slack on various events at critical path on a PERT/ CPM chart
Which one of the following is assumed for timing the activities in PERT network?
The area under β-distribution curve is divided into two equal halves by a vertical oridnate through
Which of the following is not a logical error in network construction?