Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  Topicwise Question Bank for Mechanical Engineering  >  Test: CPM & PERT - 1 - Mechanical Engineering MCQ

Test: CPM & PERT - 1 - Mechanical Engineering MCQ


Test Description

10 Questions MCQ Test Topicwise Question Bank for Mechanical Engineering - Test: CPM & PERT - 1

Test: CPM & PERT - 1 for Mechanical Engineering 2024 is part of Topicwise Question Bank for Mechanical Engineering preparation. The Test: CPM & PERT - 1 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: CPM & PERT - 1 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: CPM & PERT - 1 below.
Solutions of Test: CPM & PERT - 1 questions in English are available as part of our Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering & Test: CPM & PERT - 1 solutions in Hindi for Topicwise Question Bank for Mechanical Engineering course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: CPM & PERT - 1 | 10 questions in 30 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering Exam | Download free PDF with solutions
Test: CPM & PERT - 1 - Question 1

In the network diagram shown below:

The critical path is along

Detailed Solution for Test: CPM & PERT - 1 - Question 1


The critical path is along 1 -2-3-5-6-7-8-9 as it has maximum duration.

Test: CPM & PERT - 1 - Question 2

Refer to the network shown in the figure given below

The probability of completion of the project in 24 days is

Detailed Solution for Test: CPM & PERT - 1 - Question 2

The critical path is 1-2-3-4-6.
Ts - Scheduled time
= 24 days
Te - Expected time = 20 days

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: CPM & PERT - 1 - Question 3

The activities for which total float is equal to zero are known as

Test: CPM & PERT - 1 - Question 4

The time by which as activity can be delayed without affecting the earliest start time of any other activity in a project is called

Test: CPM & PERT - 1 - Question 5

The slack on various events at critical path on a PERT/ CPM chart

Test: CPM & PERT - 1 - Question 6

Which one of the following is assumed for timing the activities in PERT network?

Test: CPM & PERT - 1 - Question 7

The area under β-distribution curve is divided into two equal halves by a vertical oridnate through

Detailed Solution for Test: CPM & PERT - 1 - Question 7

Correct option is C. Expected time

Test: CPM & PERT - 1 - Question 8

Negative slack occurs when

Test: CPM & PERT - 1 - Question 9

Which of the following is not a logical error in network construction?

Test: CPM & PERT - 1 - Question 10

The performance of a specific task in CPM is known as

45 videos|314 tests
Information about Test: CPM & PERT - 1 Page
In this test you can find the Exam questions for Test: CPM & PERT - 1 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: CPM & PERT - 1, EduRev gives you an ample number of Online tests for practice