Civil Engineering (CE) Exam  >  Civil Engineering (CE) Tests  >  Environmental Engineering  >  Test: Construction Of Septic Tan - Civil Engineering (CE) MCQ

Test: Construction Of Septic Tan - Civil Engineering (CE) MCQ


Test Description

5 Questions MCQ Test Environmental Engineering - Test: Construction Of Septic Tan

Test: Construction Of Septic Tan for Civil Engineering (CE) 2024 is part of Environmental Engineering preparation. The Test: Construction Of Septic Tan questions and answers have been prepared according to the Civil Engineering (CE) exam syllabus.The Test: Construction Of Septic Tan MCQs are made for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Construction Of Septic Tan below.
Solutions of Test: Construction Of Septic Tan questions in English are available as part of our Environmental Engineering for Civil Engineering (CE) & Test: Construction Of Septic Tan solutions in Hindi for Environmental Engineering course. Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free. Attempt Test: Construction Of Septic Tan | 5 questions in 25 minutes | Mock test for Civil Engineering (CE) preparation | Free important questions MCQ to study Environmental Engineering for Civil Engineering (CE) Exam | Download free PDF with solutions
Test: Construction Of Septic Tan - Question 1

 The disposal of sewage from the septic tank is done by which of the following?

Detailed Solution for Test: Construction Of Septic Tan - Question 1

Explanation: Soak pit is a circular pit through which sewage is disposed in the soil.

Test: Construction Of Septic Tan - Question 2

The detention period of a septic tank is

Detailed Solution for Test: Construction Of Septic Tan - Question 2

Explanation: The septic tank has a long detention period in comparison to sedimentation than with a detention period of 12 to 36 hours.

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Construction Of Septic Tan - Question 3

The concentration of biodegradable organic matter after the septic tank is

Detailed Solution for Test: Construction Of Septic Tan - Question 3

Explanation: The effluent contains 200-250 ppm of biodegradable organic matter after the treatment from the septic tank.

Test: Construction Of Septic Tan - Question 4

What is the maximum design flow of sewage in a septic tank?

Detailed Solution for Test: Construction Of Septic Tan - Question 4

Explanation: The design flow of sewage in a septic tank lies between 40 to 70 liters per person per day

Test: Construction Of Septic Tan - Question 5

 Which of the following is not the method of disposal of sewage from septic tank?

Detailed Solution for Test: Construction Of Septic Tan - Question 5

Explanation: Vacuum filter is used in the sludge dewatering process and upflow anaerobic filter, soil absorption system and biological filter are the method of disposal of sewage from the septic tank.

14 videos|99 docs|98 tests
Information about Test: Construction Of Septic Tan Page
In this test you can find the Exam questions for Test: Construction Of Septic Tan solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Construction Of Septic Tan, EduRev gives you an ample number of Online tests for practice

Top Courses for Civil Engineering (CE)

14 videos|99 docs|98 tests
Download as PDF

Top Courses for Civil Engineering (CE)