In time-cost optimization of a project, crashing is done
Cost-benefit studies are essential to
1 Crore+ students have signed up on EduRev. Have you? Download the App |
Match List-1 (Cost) with List-il (Feature) and select the correct answer using the codes given below the lists:
List-I
A. Optimal cost
B. Overheadcost
C. Direct cost
D. Indirect cost
List-II
1. Activity related
2. Developed by crashing process
3. Project-related
4. Contained in, or contributing exclusively to the related product
In cost time optimization of a project, the project can be crashed by expediting
Which of the following represents the reduction induration?
Consider the following statements:
Crashing a project in terms of its duration would result in
1. an increase in the indirect cost
2. a decrease in the indirect cost
3. a decrease in the direct cost
4. an increase in the direct cost
Which of these statements are correct?
The reduction in project time normally results in
Economic saving of time results by crashing