PPSC PCS (Punjab) Exam  >  PPSC PCS (Punjab) Tests  >  Punjab State (PPSC) PSC: Preparation  >  Test: Energy Resources of Punjab - PPSC PCS (Punjab) MCQ

Test: Energy Resources of Punjab - PPSC PCS (Punjab) MCQ


Test Description

10 Questions MCQ Test Punjab State (PPSC) PSC: Preparation - Test: Energy Resources of Punjab

Test: Energy Resources of Punjab for PPSC PCS (Punjab) 2025 is part of Punjab State (PPSC) PSC: Preparation preparation. The Test: Energy Resources of Punjab questions and answers have been prepared according to the PPSC PCS (Punjab) exam syllabus.The Test: Energy Resources of Punjab MCQs are made for PPSC PCS (Punjab) 2025 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Energy Resources of Punjab below.
Solutions of Test: Energy Resources of Punjab questions in English are available as part of our Punjab State (PPSC) PSC: Preparation for PPSC PCS (Punjab) & Test: Energy Resources of Punjab solutions in Hindi for Punjab State (PPSC) PSC: Preparation course. Download more important topics, notes, lectures and mock test series for PPSC PCS (Punjab) Exam by signing up for free. Attempt Test: Energy Resources of Punjab | 10 questions in 12 minutes | Mock test for PPSC PCS (Punjab) preparation | Free important questions MCQ to study Punjab State (PPSC) PSC: Preparation for PPSC PCS (Punjab) Exam | Download free PDF with solutions
Test: Energy Resources of Punjab - Question 1

Which of the following statements are correct about solar power initiatives in Punjab?

  1. Punjab experiences solar insolation levels of 4–7 kWh/m².
  2. The world’s largest rooftop solar power plant is located at Dera Beas in Amritsar.
  3. Punjab generates 50 MW from the largest solar power plant in Mansa.

Select the correct answer using the code below:

Detailed Solution for Test: Energy Resources of Punjab - Question 1

Statements 1 and 2 are factually correct.
The largest solar power plant in Mansa has a capacity of 31.5 MW, not 50 MW (3 is false).

Test: Energy Resources of Punjab - Question 2

Which of the following statements are correct about the thermal power plants in Punjab?

  1. Guru Gobind Singh Super Thermal Power Plant started in 1984 and has a capacity of 1260 MW.
  2. Guru Nanak Dev Thermal Power Plant is a medium-sized coal station located in Bathinda.
  3. Guru Har Gobind Thermal Power Plant relies on water from the Bathinda branch of Sirhind canal.
  4. Talwandi Sabo Power Ltd. is a renewable energy project by the Punjab State Electricity Board.

Select the correct answer using the code below:

Detailed Solution for Test: Energy Resources of Punjab - Question 2

Guru Gobind Singh Super Thermal Power Plant details are correct (1 is true).
Guru Nanak Dev Thermal Power Plant location and type are accurate (2 is true).
Guru Har Gobind Thermal Power Plant water source is correctly mentioned (3 is true).
Talwandi Sabo Power Ltd. is a thermal power project, not renewable (4 is false).

Test: Energy Resources of Punjab - Question 3

Match the following renewable energy sources with their key initiatives:

Detailed Solution for Test: Energy Resources of Punjab - Question 3
  • Biomass energy links to Ludhiana Bio-CNG.
  • Wind energy relates to Chakwal's turbine project.
  • Solar energy links to Dera Beas rooftop plant.
Test: Energy Resources of Punjab - Question 4

Which district in Punjab hosts the Ranjit Sagar Dam?

Detailed Solution for Test: Energy Resources of Punjab - Question 4

The Ranjit Sagar Dam is located near Thein village in the Pathankot district.

Test: Energy Resources of Punjab - Question 5

Match the following power plants with their key details:

Detailed Solution for Test: Energy Resources of Punjab - Question 5

Test: Energy Resources of Punjab - Question 6

Which of the following statements are correct about the New and Renewable Sources of Energy (NRSE) Policy, 2012?

  1. It aims to raise the NRSE share to 10% of total installed power capacity by 2022.
  2. The policy focuses on decentralized renewable energy solutions for agriculture and households.
  3. It promotes research and development in emerging renewable energy technologies.
  4. Punjab generates 3,500 MW of energy under NRSE projects as of now.

Select the correct answer using the code below:

Detailed Solution for Test: Energy Resources of Punjab - Question 6

Statements 1, 2, and 3 align with the NRSE policy's goals.
However, current NRSE energy generation is 1,446.5 MW, not 3,500 MW (4 is false).

Test: Energy Resources of Punjab - Question 7

Which of the following statements are correct about the hydro power plants in Punjab?

  1. Anandpur Sahib Hydel Project utilizes water from the Bhakra Nangal system.
  2. Ranjit Sagar Dam is named after Maharaja Ranjit Singh and generates 600 MW of electricity.
  3. Mukerian Hydel Project operates near the Pong Dam on the Sutlej River.
  4. Upper Bari Doab Canal Hydel Project draws water from the Ravi River.

Select the correct answer using the code below:

Detailed Solution for Test: Energy Resources of Punjab - Question 7

Statements 1, 2, and 4 are accurate based on the hydro project details.
Mukerian Hydel Project operates near the Beas River, not the Sutlej (3 is false).

Test: Energy Resources of Punjab - Question 8

Which of the following statements are correct about the Punjab Energy Development Agency (PEDA)?

  1. PEDA was established in 1991 to promote renewable energy and energy conservation.
  2. It is a statutory body under the Electricity Act of 2003.
  3. PEDA focuses on solar, biomass, and waste-to-energy projects.

Select the correct answer using the code below:

Detailed Solution for Test: Energy Resources of Punjab - Question 8
  • PEDA was established in 1991, and its functional areas include renewable energy initiatives (1 and 3 are true).
  • It is not a statutory body; it operates as a society under the Societies Act (2 is false).
Test: Energy Resources of Punjab - Question 9

What is the installed capacity of the Guru Nanak Dev Thermal Power Plant in Bathinda?

Detailed Solution for Test: Energy Resources of Punjab - Question 9

The Guru Nanak Dev Thermal Power Plant is a medium-sized coal power station with a capacity of 440 MW.

Test: Energy Resources of Punjab - Question 10

What is the primary objective of the New and Renewable Sources of Energy Policy, 2012?

Detailed Solution for Test: Energy Resources of Punjab - Question 10

The policy aims to enhance the utilization of renewable energy to achieve this target.

23 videos|50 docs|47 tests
Information about Test: Energy Resources of Punjab Page
In this test you can find the Exam questions for Test: Energy Resources of Punjab solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Energy Resources of Punjab, EduRev gives you an ample number of Online tests for practice
Download as PDF