As per the Nagpur plan the un-surfaced roads were meant for
The total length of the first category roads was calculated by adding up the sum of
1 Crore+ students have signed up on EduRev. Have you? Download the App |
What was the development allowance assumed in the Nagpur plan?
During the development of the roads maximum priority is given to which type of road?
The total area of a state is 2500km .calculate the length of MDR
The ‘rural road development plan: Vision 2025’ aims to provide basic access to villages in how many phases?
The maximum number of cities and towns are connected by which type of highway
26 videos|91 docs|58 tests
|
26 videos|91 docs|58 tests
|