Which of the following is not a classification of labour?
What is printed list of rates of various items of work maintained by the engineering department?
1 Crore+ students have signed up on EduRev. Have you? Download the App |
Purposes of rate analysis are
a. To determine the current rate per unit of an item at the locality
b. To examine the viability of rates offered by contractors
c. To calculate the quantity of materials and labour strength required for project planning
d. To fix labour contract rates
The concrete used for cement concrete roads is of grade ___________
Which of the following is the correct order of stages of estimation of concrete roads?
The rates of materials used for government works are approved by _________
Calculate the number of cement bags required for 2500 kg of cement.
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is ___________
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is ________
5 videos|19 docs|16 tests
|
5 videos|19 docs|16 tests
|