A PERT network has 9 activities on its critical path. The standard deviation of each activity on the critical path is 3. The standard deviation of the critical path is
1 Crore+ students have signed up on EduRev. Have you? Download the App |
In a PERT distribution, the optimistic time is 4 days, expected time is 7 days and the pessimistic time is 11 days. The variance of the network is_______.
The probability distribution to represent the completion time of the project as per the PERT analysis is