When a CPM network is to be updated one considers
Which one of the following is the base for resource levelling?
1 Crore+ students have signed up on EduRev. Have you? Download the App |
The activity duration (days) and resource requirements (units) are shown in the figure below. What is the maximum resource required in a day?
What is the process of incorporating changes and rescheduling or replanning called?
Activities A and B can be started independently. Activity C follows activity A, and activity D follows activities B and C. Activity E follows activity B and precedes activity F. The activities D and F merge at the objective event. Which one of the following is the correct network of the project?
Which of the following are the possible changes during the updating of the project network?
1. Change in the duration of an activity.
2. Addition or deletion of an activity.
3. Change in the logical relationship.
Select the correct answer using the codes given below:
The constraints in case of resource smoothing operation would be
The resources in a construction project are made up of
The following table contains data on four activities, A B, C and D:
The maximum total resource load in any week will be