Test: Earthwork Estimation - 2 - Civil Engineering (CE) MCQ


Test Description

10 Questions MCQ Test Geomatics Engineering (Surveying) - Test: Earthwork Estimation - 2

Test: Earthwork Estimation - 2 for Civil Engineering (CE) 2024 is part of Geomatics Engineering (Surveying) preparation. The Test: Earthwork Estimation - 2 questions and answers have been prepared according to the Civil Engineering (CE) exam syllabus.The Test: Earthwork Estimation - 2 MCQs are made for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Earthwork Estimation - 2 below.
Solutions of Test: Earthwork Estimation - 2 questions in English are available as part of our Geomatics Engineering (Surveying) for Civil Engineering (CE) & Test: Earthwork Estimation - 2 solutions in Hindi for Geomatics Engineering (Surveying) course. Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free. Attempt Test: Earthwork Estimation - 2 | 10 questions in 30 minutes | Mock test for Civil Engineering (CE) preparation | Free important questions MCQ to study Geomatics Engineering (Surveying) for Civil Engineering (CE) Exam | Download free PDF with solutions
Test: Earthwork Estimation - 2 - Question 1

Normally earthwork is estimated for 30 m lead for distance and 1.5 m lift for height or depth, and this distance of 30 m and the height of 1.5 m are known as ____

Detailed Solution for Test: Earthwork Estimation - 2 - Question 1

Normal rate for earthwork is for 30 m lead and 1.5 m lift. For greater lead or lift the rates will be different (higher) for every unit of 30 m lead and for every unit of 1.5 m lift. The earthwork is, therefore, estimated separately for every 30 m lead and for every 1.5 m lift.

Test: Earthwork Estimation - 2 - Question 2

The vertical alignment of a road, expressed as a series of grades, connected by parabolic curves is called ______

Detailed Solution for Test: Earthwork Estimation - 2 - Question 2

The profile of a road consists of road slopes, called grades, connected by parabolic vertical curves. Vertical curves are used to provide a gradual change from one road slope to another, so that vehicles may smoothly navigate grade changes as they travel.
Sag vertical curves are those that have a tangent slope at the end of the curve that is higher than that of the beginning of the curve. When driving on a road, a sag curve would appear as a valley, with the vehicle first going downhill before reaching the bottom of the curve and continuing uphill or level.

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Earthwork Estimation - 2 - Question 3

Calculate the quantity of earthwork for 200 m length for a portion of road in an uniform ground the heights of banks at the two ends being 1.00 m and 1.60 m. The formation width is 10 mm and side slope 2:1. Assume that there is no traverse slope.

Detailed Solution for Test: Earthwork Estimation - 2 - Question 3

Quantity = (Bd+sd2) *length
Where, B=10 m, S=2, L=200 m, d=mean depth = (1+1.60)/2 = 1.30 m
Quantity = (10*1.3+2*1.32)*200 = (13=3.38)*200 = 16.38*200 = 3276 cu m.

Test: Earthwork Estimation - 2 - Question 4

A raised edge at the side of the roadway is known as _____

Detailed Solution for Test: Earthwork Estimation - 2 - Question 4

A curb or kerb is the edge where a raised sidewalk (pavement in British English) or road median/central reservation meets a street or other roadway.

Test: Earthwork Estimation - 2 - Question 5

A ________ is a thoroughfare, route, or way on land between two places that has been paved or otherwise improved to allow travel by foot or some form of conveyance, including a motor vehicle, cart, bicycle, or horse.

Detailed Solution for Test: Earthwork Estimation - 2 - Question 5

Roads consist of one or two roadways (British English: carriageways), each with one or more lanes and any associated sidewalks (British English: pavement) and road verges. In the Netherlands there is often a Protected Bicycle Path provided for cycling.
Roads available for use by the public may be referred to as parkways, avenues, freeways, interstates, highways, or primary, secondary, and tertiary local roads.

Test: Earthwork Estimation - 2 - Question 6

 ___________ is the application of controlled amounts of water to plants at needed intervals.

Detailed Solution for Test: Earthwork Estimation - 2 - Question 6

Explanation: Irrigation helps grow agricultural crops, maintain landscapes, and revegetate disturbed soils in dry areas and during periods of inadequate rainfall. Irrigation also has other uses in crop production, including frost protection, suppressing weed growth in grain fields and preventing soil. In contrast, agriculture that relies only on direct rainfall is referred to as rain-fed or dry land farming.

Test: Earthwork Estimation - 2 - Question 7

Typical lane widths range from ______ metres to _____ metres.

Detailed Solution for Test: Earthwork Estimation - 2 - Question 7

Wider lanes and shoulders are usually used on roads with higher speed and higher volume traffic, and significant numbers of trucks and other large vehicles. Narrower lanes may be used on roads with lower speed or lower volume traffic.
Narrow lanes cost less to build and maintain, but also reduce the capacity of a road to convey traffic. On rural roads, narrow lanes are likely to experience higher rates of run-off-road and head-on collisions. Wider roads increase the time needed to walk across and increase storm water runoff.

Test: Earthwork Estimation - 2 - Question 8

What is the longitudinal slope called?

Detailed Solution for Test: Earthwork Estimation - 2 - Question 8

The grade (also called slope, incline, gradient, mainfall, pitch or rise) of a physical feature, landform or constructed line refers to the tangent of the angle of that surface to the horizontal. It is a special case of the slope, where zero indicates horizontality. A larger number indicates higher or steeper degree of “tilt”. Often slope is calculated as a ratio of “rise” to “run”, or as a fraction (“rise over run”) in which run is the horizontal distance and rise is the vertical distance.

Test: Earthwork Estimation - 2 - Question 9

Designated point on a road where road marking or other means helps pedestrians cross safely is called?

Detailed Solution for Test: Earthwork Estimation - 2 - Question 9

A pedestrian crossing or crosswalk is a place designated for pedestrians to cross a road. Crosswalks are designed to keep pedestrians together where they can be seen by motorists, and where they can cross most safely across the flow of vehicular traffic.
Marked pedestrian crossings are often found at intersections, but may also be at other points on busy roads that would otherwise be too unsafe to cross without assistance due to vehicle numbers, speed or road widths. They are also commonly installed where large numbers of pedestrians are attempting to cross (such as in shopping areas) or where vulnerable road users (such as school children) regularly cross.

Test: Earthwork Estimation - 2 - Question 10

To calculate the volume of earthwork from contour plan for filling a depression or pond and for cutting a hillock _____ may be used conveniently.

Detailed Solution for Test: Earthwork Estimation - 2 - Question 10

The area with every contour may be found by using a Planimeter or a tracing paper containing squares. Then the prismoidal formula may be applied to calculate the volume, the distance between the two sections will be the contour intervals, i.e., the difference of level between two consecutive contours.

19 videos|31 docs|35 tests
Information about Test: Earthwork Estimation - 2 Page
In this test you can find the Exam questions for Test: Earthwork Estimation - 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Earthwork Estimation - 2, EduRev gives you an ample number of Online tests for practice

Up next

Download as PDF

Up next