Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  Topicwise Question Bank for Mechanical Engineering  >  Test: Loading & Scheduling - 2 - Mechanical Engineering MCQ

Test: Loading & Scheduling - 2 - Mechanical Engineering MCQ


Test Description

10 Questions MCQ Test Topicwise Question Bank for Mechanical Engineering - Test: Loading & Scheduling - 2

Test: Loading & Scheduling - 2 for Mechanical Engineering 2024 is part of Topicwise Question Bank for Mechanical Engineering preparation. The Test: Loading & Scheduling - 2 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: Loading & Scheduling - 2 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Loading & Scheduling - 2 below.
Solutions of Test: Loading & Scheduling - 2 questions in English are available as part of our Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering & Test: Loading & Scheduling - 2 solutions in Hindi for Topicwise Question Bank for Mechanical Engineering course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: Loading & Scheduling - 2 | 10 questions in 30 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study Topicwise Question Bank for Mechanical Engineering for Mechanical Engineering Exam | Download free PDF with solutions
Test: Loading & Scheduling - 2 - Question 1

Match phrases in List-I with List-Il:
List-I
A. Lead time forecast
B. Master production schedule
C. Payback period
D. Early start schedule
List-Il
1. Material requirement planning
2. Financial appraisal
3. Project planning
4. Inventory control

Test: Loading & Scheduling - 2 - Question 2

Match the List-I with List-Il most appropriately:
List-I
A. Strategic decision
B. Bullwhip effect
C. Flexible manufacturing system
D. Tactical decision
E. Operational decision
List-II
1. Production scheduling
2. Reduce manufacturing lead time
3. Plant layout
4. Price fluctuations
5. Inventory policies

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Loading & Scheduling - 2 - Question 3

Which of the following is TRUE regarding services scheduling?

Test: Loading & Scheduling - 2 - Question 4

Which of these is not part of the planning files of a production planning and control system?

Test: Loading & Scheduling - 2 - Question 5

In production, planning and control, the document which authorizes the start of an operation on the shop floor is the:

Test: Loading & Scheduling - 2 - Question 6

Which of the following are tools of shop floor control?

Test: Loading & Scheduling - 2 - Question 7

Which one of the following is not a function of production control?

Detailed Solution for Test: Loading & Scheduling - 2 - Question 7

Routing, scheduling and dispatching are the function of production control.

Test: Loading & Scheduling - 2 - Question 8

The function which authorizes production as well as control is

Test: Loading & Scheduling - 2 - Question 9

Chart which is useful for scheduling and control is

Test: Loading & Scheduling - 2 - Question 10

Determination of the sequence of operations to be performed and the allocation of facilities where these operations are to be performed is

45 videos|314 tests
Information about Test: Loading & Scheduling - 2 Page
In this test you can find the Exam questions for Test: Loading & Scheduling - 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Loading & Scheduling - 2, EduRev gives you an ample number of Online tests for practice

Top Courses for Mechanical Engineering

Download as PDF

Top Courses for Mechanical Engineering