Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  GATE Mechanical (ME) Mock Test Series 2025  >  Test: Sampling, JIT, TQM & Graphical Method - 2 - Mechanical Engineering MCQ

Test: Sampling, JIT, TQM & Graphical Method - 2 - Mechanical Engineering MCQ


Test Description

25 Questions MCQ Test GATE Mechanical (ME) Mock Test Series 2025 - Test: Sampling, JIT, TQM & Graphical Method - 2

Test: Sampling, JIT, TQM & Graphical Method - 2 for Mechanical Engineering 2024 is part of GATE Mechanical (ME) Mock Test Series 2025 preparation. The Test: Sampling, JIT, TQM & Graphical Method - 2 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: Sampling, JIT, TQM & Graphical Method - 2 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Sampling, JIT, TQM & Graphical Method - 2 below.
Solutions of Test: Sampling, JIT, TQM & Graphical Method - 2 questions in English are available as part of our GATE Mechanical (ME) Mock Test Series 2025 for Mechanical Engineering & Test: Sampling, JIT, TQM & Graphical Method - 2 solutions in Hindi for GATE Mechanical (ME) Mock Test Series 2025 course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: Sampling, JIT, TQM & Graphical Method - 2 | 25 questions in 75 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study GATE Mechanical (ME) Mock Test Series 2025 for Mechanical Engineering Exam | Download free PDF with solutions
Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 1

Which one of the following statements is not correct? 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 2

Consider the following statements:

Linear programming model can be applied to:
1. Line balancing problem
2. Transportation problem
3. Project ma nagement

Of these statements: 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 2

Linear programming model can be applied to line balancing problem and transportation problem but not to project management. 

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 3

Assertion (A): Sampling plans with acceptance number greater than zero are generally better than sampling plans with acceptance number equal to zero.

Reason (R): Sampling plans with acceptance number greater than zero have a larger sample size as compared to similar sampling plans with acceptance number equal to zero. 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 4

The primal of a LP problem is maximization of objective function with 6 variables and 2 constraints.

Which of the following correspond to the dual of the problem stated?
1. It has 2 variables and 6 constraints
2. It has 6 variables and 2 constraints
3. Maximization of objective function
4. Minimization of objective function

Select the correct answer using the codes given below:  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 5

Which one of the following is not the characteristic of acceptance sampling? 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 6

Solution to Z =  4x1 + 6x2

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 6

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 7

Assertion (A): In attribute control of quality by sampling, the sample size has to be larger than variable control.

Reason (R): Variables are generally continuous, and attributes have few discrete levels.  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 8

In a linear programming problem, which one of the following is correct for graphical method? 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 9

Assertion (A): In dodge romig sampling tables, the screening inspection of rejected lots is also included.

Reason (R): Dodge romig plans are indexed at an LTPD of 10%  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 10

Which of the following are correct in respect of graphically solved linear programming problems?

1. The region of feasible solution has concavity property.
2. The boundaries of the region are lines or planes.
3. There are corners or extreme points on the boundary

Select the correct answer using the code given below:  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 11

Consider the following statements in respect of double sampling plan:

1. Average number of pieces inspected is double that of single sampling
2. Average number of pieces inspected is less than that for single sampling
3. Decision to accept or reject the lot is taken only after the inspection of both samples
4. Decision to accept or reject the lot is reached sometimes after one sample and sometimes after two samples

Which of these statements are correct?  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 12

In case of solution of linear programming problem using graphical method, if the constraint line of one of the non-redundant constraints is parallel to the objective function line, then it indicates 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 12

All points on the line is a solution. So there are infinite no of optimal solutions. 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 13

The product is assembled from parts A and B. The probability of defective parts A and B are 0.1 and 0.2 respectively. Then the probability of the assembly of A and B to be non defective is: 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 13

It is a case of mutually independent events. Probability that the part A is non-defective = 1 - 0.1 = 0.9

Probability that Part-B is non-defective, = 1 - 0.2 = 0.8

Hence, probability that both Part-A and Part-B are non-defective = 0.9 x 0.8 = 0.72.

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 14

Which one of the following statements is NOT correct? 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 15

In a study to estimate the idle time of a machine, out of 100 random observations the machine was found idle on 40 observations. The total random observations required for 95% confidence level and ± 5% accuracy is: 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 15

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 16

A variable which has no physical meaning, but is used to obtain an initial basic feasible solution to the linear programming problem is referred to as: 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 17

A control chart is established with limits of ± 2 standard errors for use in monitoring samples of size n = 20. Assume the process to be in control. What is the likelihood of a sample mean falling outside the control limits? 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 18

Consider the following statements regarding the characteristics of the standard form of a linear programming problem:

1. All the constraints are expressed in the form of equations.
2. The right-hand side of each constraint equation is non-negative.
3. All the decision variables are non-negative.

Which of these statements are correct?  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 19

The management is interested to know the percentage of idle time of equipment. The trial study showed that percentage of idle time would be 20%. The number of random observations necessary for 95% level of confidence and ± 5% accuracy is: 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 19

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 20

A variable which has no physical meaning, but is used to obtain an initial basic feasible solution to the linear programming problem is referred to as: 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 21

For a confidence level of 95% and accuracy ± 5%, the number of cycles to be timed in a time study is equal to:

Where, N = Number of observations taken; X = X1, X2, ...., XN are individual observations. What is the value of K? 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 21

For 95% confidence level
K = 2 
S = Accuracy = 0.05 

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 22

If m is  the number of constraints in a linear programming with two variables x and y and non-negativity constraints x ≥ 0, y ≥ 0; the feasible region in the graphical solution will be surrounded by how many lines? 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 22

Constraints = 3 the feasible region is surrounded by more two lines x-axis and y-axis.

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 23

If one state occurred four times in hundred observations while using the work-sampling technique, then the precision of the study using a 95% confidence level will be: 

Detailed Solution for Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 23

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 24

Which of the following conditions are necessary of applying linear programming?

1. There must be a well defined objective function
2. The decision variables should be interrelated and non-negative
3. The resources must be in limited supply  

Test: Sampling, JIT, TQM & Graphical Method - 2 - Question 25

Match List-I with List-II and select the correct answer:


29 docs|220 tests
Information about Test: Sampling, JIT, TQM & Graphical Method - 2 Page
In this test you can find the Exam questions for Test: Sampling, JIT, TQM & Graphical Method - 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Sampling, JIT, TQM & Graphical Method - 2, EduRev gives you an ample number of Online tests for practice

Top Courses for Mechanical Engineering

Download as PDF

Top Courses for Mechanical Engineering