Test: Sleepers & Ballast - 2


10 Questions MCQ Test Topicwise Question Bank for Civil Engineering | Test: Sleepers & Ballast - 2


Description
This mock test of Test: Sleepers & Ballast - 2 for Civil Engineering (CE) helps you for every Civil Engineering (CE) entrance exam. This contains 10 Multiple Choice Questions for Civil Engineering (CE) Test: Sleepers & Ballast - 2 (mcq) to study with solutions a complete question bank. The solved questions answers in this Test: Sleepers & Ballast - 2 quiz give you a good mix of easy questions and tough questions. Civil Engineering (CE) students definitely take this Test: Sleepers & Ballast - 2 exercise for a better result in the exam. You can find other Test: Sleepers & Ballast - 2 extra questions, long questions & short questions for Civil Engineering (CE) on EduRev as well by searching above.
QUESTION: 1

Minimum composite sleeper index prescribed on Indian Railways for a track sleeper is

Solution:
QUESTION: 2

Width of ballast section for Broad Gauge is

Solution:
QUESTION: 3

Number of keys used in CST-9 sleeper is

Solution:
QUESTION: 4

Loose jaw as of steel trough sleepers are made of

Solution:
QUESTION: 5

Number of cotters used in CST-9 sleepers is

Solution:
QUESTION: 6

Pandrol clips cannot be used with

Solution:
QUESTION: 7

Which of the following statements regarding ballast materials are correct?
1. Brick ballast has poor drainage characteristics.
2. Coal ash is not used as ballast with steel or cast iron sleepers.
3. Gravel ballast gives better performance on soft formation.
4. Sand ballast causes excessive wear on top of rail.
Select the correct answer using the codes given below:

Solution:
QUESTION: 8

Which of the following statements regarding ballast materials are correct?
1. Brick ballast has poor drainage characteristics
2. Coal ash not used as ballast with steel or cast iron sleepers
3. Gravel ballast gives better performance in soft formation
4. Sand ballast causes excessive wear on top of rail
Select the correct answer using the codes given -below:
Codes:

Solution:
QUESTION: 9

Consider the following statements about concrete sleepers:
1. They improve the track modulus.
2. They have good scrap value. 
3. They render transportation easy.
4. They maintain the gauge quite satisfactorily.
Which of these statements are correct?

Solution:

The scrap value of concrete sleepers is nil.

QUESTION: 10

Squaring of sleepers through packing consists of

Solution:

In through packing the sleepers are squared and brought to specified spacing at straight lengths and on curves i.e., the ballast under the sleepers is adjusted to space them parallel to each other.