Civil Engineering (CE) Exam  >  Civil Engineering (CE) Tests  >  GATE Civil Engineering (CE) 2025 Mock Test Series  >  Test: Hydrographs - 3 - Civil Engineering (CE) MCQ

Test: Hydrographs - 3 - Civil Engineering (CE) MCQ


Test Description

10 Questions MCQ Test GATE Civil Engineering (CE) 2025 Mock Test Series - Test: Hydrographs - 3

Test: Hydrographs - 3 for Civil Engineering (CE) 2024 is part of GATE Civil Engineering (CE) 2025 Mock Test Series preparation. The Test: Hydrographs - 3 questions and answers have been prepared according to the Civil Engineering (CE) exam syllabus.The Test: Hydrographs - 3 MCQs are made for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Hydrographs - 3 below.
Solutions of Test: Hydrographs - 3 questions in English are available as part of our GATE Civil Engineering (CE) 2025 Mock Test Series for Civil Engineering (CE) & Test: Hydrographs - 3 solutions in Hindi for GATE Civil Engineering (CE) 2025 Mock Test Series course. Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free. Attempt Test: Hydrographs - 3 | 10 questions in 30 minutes | Mock test for Civil Engineering (CE) preparation | Free important questions MCQ to study GATE Civil Engineering (CE) 2025 Mock Test Series for Civil Engineering (CE) Exam | Download free PDF with solutions
Test: Hydrographs - 3 - Question 1

In an S-curve derived by a unit hydrograph U of D-h duration

Test: Hydrographs - 3 - Question 2

A 4 hour unit hydrograph of a basin with area of 1728 km2 can be approximated as a triangle with base period of 48 hours. The peak ordinate of hydrograph is

Detailed Solution for Test: Hydrographs - 3 - Question 2



1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Hydrographs - 3 - Question 3

An instantaneous unit hydrograph is a direct runoff hydrograph

Detailed Solution for Test: Hydrographs - 3 - Question 3

A finite unit hydrograph is indicated as the duration D → 0. The limiting case of a unit hydrograph of zero duration is known as Instantaneous Unit Hydrograph (IUH).

Test: Hydrographs - 3 - Question 4

The shape of the recession limb of a hydrograph depends on

Detailed Solution for Test: Hydrographs - 3 - Question 4

The climatic factors control the rising iimb and the recession limb is independent of storm characteristics, being determined by catchment characteristics only.

Test: Hydrographs - 3 - Question 5

Instantaneous unit hydrograph is a hydrograph of

Test: Hydrographs - 3 - Question 6

In Synder’s method of synthetic unit hydrograph development, basin lag is taken as

Detailed Solution for Test: Hydrographs - 3 - Question 6

The most important characteristic of a basin affecting a hydrograph due to a given storm is basin lag. Basin lag is the time difference between the centroids of the input (rainfall excess) and the output (surface runoff).

Test: Hydrographs - 3 - Question 7

The ordinate of the IUH of a catchment at any time t is the

Test: Hydrographs - 3 - Question 8

If a 4-hour unit hydrograph of a certain basin has a peak ordinate of 80 m3/s, the peak ordinate of a 2-hour unit hydrograph for the same basin will be

Detailed Solution for Test: Hydrographs - 3 - Question 8

With the reduction of unit hydrograph duration, 1 cm excess rainfall will occur in reduced period. So peak ordinate of UH will increase and time base will decrease. Thus the peak ordinate of 2 hr UH will be greater than 80 m3/s.

Test: Hydrographs - 3 - Question 9

The point of inflection on the recession limb of a hydrograph represents

Detailed Solution for Test: Hydrographs - 3 - Question 9

The starting point of the recession limb, i.e., the point of inflection represents the condition of maximum storage.

Test: Hydrographs - 3 - Question 10

A flood-hydrograph due to an isolated storm consists of

Detailed Solution for Test: Hydrographs - 3 - Question 10

The hydrograph is the response of a given catchment to a rainfall implicit. It consists of flow in all the three phases of runoff, viz. surface runoff, interflow and base flow.

31 docs|280 tests
Information about Test: Hydrographs - 3 Page
In this test you can find the Exam questions for Test: Hydrographs - 3 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Hydrographs - 3, EduRev gives you an ample number of Online tests for practice

Up next

Download as PDF

Up next