CUET Commerce Exam  >  CUET Commerce Tests  >  General Test Preparation for CUET  >  Test: Arun Sharma Based Level 3: Time & Work - CUET Commerce MCQ

Test: Arun Sharma Based Level 3: Time & Work - CUET Commerce MCQ


Test Description

30 Questions MCQ Test General Test Preparation for CUET - Test: Arun Sharma Based Level 3: Time & Work

Test: Arun Sharma Based Level 3: Time & Work for CUET Commerce 2024 is part of General Test Preparation for CUET preparation. The Test: Arun Sharma Based Level 3: Time & Work questions and answers have been prepared according to the CUET Commerce exam syllabus.The Test: Arun Sharma Based Level 3: Time & Work MCQs are made for CUET Commerce 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Arun Sharma Based Level 3: Time & Work below.
Solutions of Test: Arun Sharma Based Level 3: Time & Work questions in English are available as part of our General Test Preparation for CUET for CUET Commerce & Test: Arun Sharma Based Level 3: Time & Work solutions in Hindi for General Test Preparation for CUET course. Download more important topics, notes, lectures and mock test series for CUET Commerce Exam by signing up for free. Attempt Test: Arun Sharma Based Level 3: Time & Work | 30 questions in 25 minutes | Mock test for CUET Commerce preparation | Free important questions MCQ to study General Test Preparation for CUET for CUET Commerce Exam | Download free PDF with solutions
Test: Arun Sharma Based Level 3: Time & Work - Question 1

A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 1

► A can do work in 15 days therefore amount of work done by A in 1 day is 60/15 = 4 units
► B can do work in 15 days therefore amount of work done by A in 1 day is 60/20 = 3 units
► Total amount of work done in 1 day = A work of 1 day + B's work of 1 day = 4 units + 3 units = 7 units
► Amount of work done in 4 days = 4*7 = 28 units
Amount of Work Left = 60 - 28 = 32 units
► Fraction of work left = Amount of work left/ Total Work = 32/60 
⇒ 8/15.

Test: Arun Sharma Based Level 3: Time & Work - Question 2

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 2

(A + B + C)'s 1 day's work = 1/4
A's 1 day's work = 1/16
B's 1 day's work = 1/12
∴ C's 1 day's work = 1/4 - (1/16 + 1/12) = 1/4 - 7/48 = 5/48
So, C alone can do the work in 48/5 days

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Arun Sharma Based Level 3: Time & Work - Question 3

A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 3

A's 2 day's work = 1/20 x 2 = 1/10
(A + B + C)'s 1 day's work = (1/20 + 1/30 + 1/60) = 6/60 = 1/10
Work done in 3 days = 1/10 + 1/10 = 1/5
Now, 1/5 work is done in 3 days.
∴ Whole work will be done in (3 x 5) = 15 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 4

A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 4

► Ratio of times taken by A and B = 1 : 3.
► The time difference is (3 - 1) 2 days while B take 3 days and A takes 1 day.
► If difference of time is 2 days, B takes 3 days.
► If difference of time is 60 days, B takes 3/2 x 60 = 90 days.
► So, A takes 30 days to do the work.
A's 1 day's work = 1/30
B's 1 day's work = 1/90
(A + B)'s 1 day's work = 1/30 + 1/90 = 4/90 = 2/45
∴ A and B together can do the work in 45/2 = 22.5 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 5

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 5

C's 1 day's work = 1/3 - (1/6 + 1/8)
⇒ 1/3 - 7/24
⇒ 1/24
A's wages : B's wages : C's wages = 1/6 : 1/8 : 1/24
⇒ 4 : 3 : 1
C's share (for 3 days) = Rs.(3 * 1/24 * 3200)
⇒ Rs. 400

Test: Arun Sharma Based Level 3: Time & Work - Question 6

If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 6

► Let 1 man's 1 day's work = x and 1 boy's 1 day's work = y.
► Then, 6x + 8y = 1/10 and 26x + 48y = 1/2
Solving these two equations, we get :
x = 1/100 and y = 1/200
(15 men + 20 boy)'s 1 day's work = 15/100 + 20/200 = 1/4
∴ 15 men and 20 boys can do the work in 4 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 7

A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 7

 A’s 1 hour work = 1/4
(B + C)’s 1 hour work = 1/3
(C + A)’s 1 hour work = 1/2
(A + B + C)’s 1 hour work = 1/4 + 1/3 =7/12
B’s 1 hour work = 7/12 - 1/2 = 1/12
B alone can do a piece of work in 12 hours.

Test: Arun Sharma Based Level 3: Time & Work - Question 8

A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 8

► Let a, b and c be the fraction of work per day by A,B & C respectively.
c = 1/50
a + b = 1/10 = 5/50 .
a = b + c.
Therefore,
⇒ 2b + c = 5/50
⇒ 2b = 5/50 - 1/50 = 2/25
⇒ b = 1/25
B will do it in 25 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 9

A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 9

Whole work is done by A in 20 x 5/4 = 25 days.
Now,(1 - 4/5) i.e., 1/5 work is done by A and B in 3 days.
Whole work will be done by A and B in (3 x 5) = 15 days.
A's 1 day's work = 1/25, (A + B)'s 1 day's work = 1/15
∴ B's 1 day's work = 1/15 - 1/25 = 4/150 = 2/75
So, B alone would do the work in 75/2 = 37.5 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 10

A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 A.M. while machine P is closed at 11 A.M. and the remaining two machines complete work. Approximately at what time will the work (to print one lakh books) be finished ?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 10

(P + Q + R)'s 1 hour's work = 1/8 + 1/10 + 1/12 = 37/120
Work done by P, Q and R in 2 hours = 37/120 x 2 = 37/60
Remaining work = 1 - 37/60 = 23/60
(Q + R)'s 1 hour's work = 1/10 + 1/12 = 11/60
Now, 11/60 work is done by Q and R in 1 hour.
So, 23/60 work will be done by Q and R in 60/11 x 23/60 = 23/11 hours ≌ 2 hours.
So, the work will be finished approximately 2 hours after 11 A.M., i.e., around 1 P.M.

Test: Arun Sharma Based Level 3: Time & Work - Question 11

A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 11

► A can finish work in 18 days. It means A can do the work in one day=  1 / 18 part 
► B can finish work in 15 days. It means B can do the work in one day = 1 / 15 part 
► B worked alone for 10 days and then left the job. Thus in 10 days B has completed part of work 
(1 / 15)*10 = 10 / 15 part  or  2 / 3 part of work. 
Remaining work left = ( 1- 2 / 3 ) 
⇒  1 / 3 part of work remaining 
► A can do 1 / 18 part of work in one day. Therefore, 1 / 3 part will be completed by him 
⇒ (1 / 1/18)* 1/3
⇒ 1 /3 * 18 / 1
⇒ 18 / 3 days 
⇒ 6 days
( A alone will complete the work in 6 days)

Test: Arun Sharma Based Level 3: Time & Work - Question 12

4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 12

Let 1 man's 1 day's work = x and 1 woman's 1 day's work = y.

Solving the two equations, we get. 
∴ 1 woman's 1 day's work 
⇒ 10 women's 1 day's work 
Hence. 10 women will complete the work in 40 days

Test: Arun Sharma Based Level 3: Time & Work - Question 13

A and B can together finish a work 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days A alone can finish the work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 13

(A + B)'s 20 day's work = 1/30 x 20 = 2/3
Remaining work =1 - 2/3 = 1/3
Now, 1/3 work is done by A in 20 days.
Therefore, the whole work will be done by A in (20 x 3) = 60 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 14

P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 14

P can complete the work in (12 x 8) hrs. = 96 hrs.
Q can complete the work in (8 x 10) hrs. = 80 hrs.
∴ P's 1 hour's work = 1/96 and Q's 1 hour's work = 1/80
(P + Q)'s 1 hour's work = 1/96 + 1/80 = 11/480
So, both P and Q will finish the work in 480/11 hrs.
∴ Number of days of 8 hours each = 480/11 x 1/8 = 60/11 days 

Test: Arun Sharma Based Level 3: Time & Work - Question 15

10 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 15

1 woman's 1 day's work = 1/70
1 child's 1 day's work = 1/140
(5 women + 10 children)'s day's work = 5/170 + 10/140 = 1/14 + 1/14 = 1/7
∴ 5 women and 10 children will complete the work in 7 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 16

X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 16

Work done by X in 4 days = (1/20) * 4 = 1/5
Remaining work =1 - 1/5 = 4/5
(X + Y)'s 1 day's work = 1/20 + 1/12 = 8/60 = 2/15
Now, 2/15 work is done by X and Y in 1 day.
So, 4/5 work will be done by X and Y in (15/2) * (4/5) = 6 days.
Hence, total time taken = (6 + 4) days = 10 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 17

A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 17

► Ratio of times taken by A and B = 100 :130 = 10:13
► Suppose B takes x days to do the work
Then,10:13::23:x
⇒ x = (23×13)/10
⇒ x = 299/10
A's 1day's work = 1/23
B's 1day's work = 10/299
(A + B)'s 1 day's work = 1/23 + 10/299 = 23/299 = 1/13
∴ A and B together can complete the work in 13 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 18

Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 18

► Number of pages typed by Ravi in 1 hour = 32/6 = 16/3
► Number of pages typed by kumar in 1 hour = 40/5 = 8
► Number of pages typed by both in 1 hour = 16/3 + 8 = 40/3
∴ Time taken by both to type 110 pages = 110 x 3/40 hours
⇒ 33/4 hours or 8 hours 15 minutes

Test: Arun Sharma Based Level 3: Time & Work - Question 19

A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 19

A’s 1 day work = 1/24
B’s 1 day work = 1/6
C’s 1 day work = 1/12
(A+B+C)’s 1 day work = 1/24 + 1/6 + 1/12 = 7/24
The work will be completed by them is 24/7 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 20

Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 20

Ratio of times taken by Sakshi and Tanya = 125 : 100 = 5 : 4.
Suppose Tanya takes x days to do the work.
5 : 4 :: 20 : x ⇒ x = 4 * (20/5)
⇒ x = 16 days
Hence, Tanya takes 16 days to complete the work.

Test: Arun Sharma Based Level 3: Time & Work - Question 21

A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 21

Suppose A, B and C take x, x/2 and x/3 days respectively to finish the work.
Then,1/x + 2/x + 3/x = 1/2
⇒ 6/x = 1/2
⇒ x = 12.
So, B takes (12/2) = 6 days to finish the work.

Test: Arun Sharma Based Level 3: Time & Work - Question 22

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in :

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 22

► Let total work be 30 units (LCM of 10 and 15).
► In one day, A can do 2 units of work and B can do 3 units of work.
► In one day, both A and B can do 5 units of work.
► In two days, A and B will complete 10 units of work. Remaining 20 units can be completed by A in 10 days (at rate of 2 units per day).
► Hence, whole work will be completed in 12 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 23

A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 23

2(A + B + C)'s 1 clay's work 
Therefore. (A + B + C)'s 1 clay's work 
Work done by A, B. C in 10 days 

Now, 1/48 work is done by A in 1 day.
So. 3/8 work will be done by A in 

Test: Arun Sharma Based Level 3: Time & Work - Question 24

A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 24

Ratio of rates of working of A and B = 2 : 1
So, ratio of time taken = 1 : 2
B's 1 day's work = 1/12
∴ A's one day work = 1/3 (2 times of B's work)
(A + B)'s 1 day's work = (1/6) + (1/12) = 3/12 = 1/4
So, A and B together can finish work in 4 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 25

Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 25

(20 x 16) women can complete the work in 1 day.
∴ 1 woman's 1 day's work =1/320
(16 x 15) men can complete the work in 1 day.
∴ 1 man's 1 day's work = 1/240
So, required ratio = 1/240 : 1/320
⇒ 1/3 :1/4
⇒ 4 : 3 (cross multiplied)

Test: Arun Sharma Based Level 3: Time & Work - Question 26

A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in :

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 26

(A + B + C)'s 1 day's work = 1/6
(A + B)'s 1 day's work = 1/8    
(B + C)'s 1 day's work = 1/12    
Therefore (A + C)'s 1 day's work    
⇒ (2 x 1/6) - (1/8 + 1/12)
⇒ (1/3 - 5/24)
⇒ 3/24
⇒ 1/8
So, A and C together will do the work in 8 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 27

A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in:

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 27

(B + C)'s 1 day's work  
Work done by B and C in 3 days 
Remaining work 
Now, 1/24 work is done by A in 1 day.
So, 5/12 work is done by A in 

Test: Arun Sharma Based Level 3: Time & Work - Question 28

X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 28

No of days taken by X to finish the work = 40
So part of work done by X in 1 day = 1/40
Part of work done by X in 8 days = 8/40 = 1/5
The remaining part = 1 - 1/5 = 4/5
No of days taken by Y to finish 4/5 part = 16
Part of work done by Y in 1 day = (4/5)/16
⇒ (4/5)(1/16)
⇒ 1/20
Part of work done by both together in 1 day = (1/40) + (1/20) = 3/40
Hence, X and Y will together complete the work in = 40/3

Test: Arun Sharma Based Level 3: Time & Work - Question 29

If A and B together can complete a piece of work in 15 days and B alone in 20 days, in how many days can A alone complete the work?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 29

Given, (A + B)’s 1 day’s work = 1/15
B’s 1 day’s work  = 1/20
∴ A’s 1 day’s work will be
⇒ 1/15 - 1/20
⇒ (4-3)/60
⇒ 1/60
∴ A alone will do the work in 60 days.

Test: Arun Sharma Based Level 3: Time & Work - Question 30

A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?

Detailed Solution for Test: Arun Sharma Based Level 3: Time & Work - Question 30

Let A's 1 day's work = x and B's 1 day's work = y.
Then, x + y = 1/30 and 16x + 44y = 1
Solving these two equations, we get: 
x = 1/60 and y = 1/60
∴ B's 1 day's work = 1/60
Hence, B alone shall finish the whole work in 60 days.

154 videos|449 docs|713 tests
Information about Test: Arun Sharma Based Level 3: Time & Work Page
In this test you can find the Exam questions for Test: Arun Sharma Based Level 3: Time & Work solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Arun Sharma Based Level 3: Time & Work, EduRev gives you an ample number of Online tests for practice

Top Courses for CUET Commerce

154 videos|449 docs|713 tests
Download as PDF

Top Courses for CUET Commerce