Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  GATE Mechanical (ME) Mock Test Series 2025  >  Test: Forecasting Routing & Scheduling - 2 - Mechanical Engineering MCQ

Test: Forecasting Routing & Scheduling - 2 - Mechanical Engineering MCQ


Test Description

30 Questions MCQ Test GATE Mechanical (ME) Mock Test Series 2025 - Test: Forecasting Routing & Scheduling - 2

Test: Forecasting Routing & Scheduling - 2 for Mechanical Engineering 2024 is part of GATE Mechanical (ME) Mock Test Series 2025 preparation. The Test: Forecasting Routing & Scheduling - 2 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: Forecasting Routing & Scheduling - 2 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Forecasting Routing & Scheduling - 2 below.
Solutions of Test: Forecasting Routing & Scheduling - 2 questions in English are available as part of our GATE Mechanical (ME) Mock Test Series 2025 for Mechanical Engineering & Test: Forecasting Routing & Scheduling - 2 solutions in Hindi for GATE Mechanical (ME) Mock Test Series 2025 course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: Forecasting Routing & Scheduling - 2 | 30 questions in 90 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study GATE Mechanical (ME) Mock Test Series 2025 for Mechanical Engineering Exam | Download free PDF with solutions
Test: Forecasting Routing & Scheduling - 2 - Question 1

In a time series forecasting model, the demand for five time periods was 10, 13, 15, 18 and 22. A linear regression fit resulted in an equation F = 6.9 + 2.9 t where F is the forecast for period t. The sum of absolute deviations for the five data is: 

Detailed Solution for Test: Forecasting Routing & Scheduling - 2 - Question 1

Sum of absolute deviation  
= (D1 – F1) + (D2 – F2) + (D3 – F3) + (D4 – F4) + (D5 – F5)  
= (10 – 6.9 – 2.9x1) + (13 – 6.9 – 2.9x2) + (15 – 6.9 – 2.9x3) + …………….

Test: Forecasting Routing & Scheduling - 2 - Question 2

Production scheduling is simpler, and high volume of output and high labour efficiency are achieved in the case of: 

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Forecasting Routing & Scheduling - 2 - Question 3

Which one of the following is not a purpose of long-term forecasting? 

Test: Forecasting Routing & Scheduling - 2 - Question 4

A manufacturer's master product schedule of a product is given below:

Each product requires a purchased component A in its subassembly. Before the start of week-1, there are 400 components of type A in stock. The lead time to procure this component is 2 weeks and the order quantity is 400. Number of components A per product is only one. The manufacturer should place the order for 

Test: Forecasting Routing & Scheduling - 2 - Question 5

Which one of the following is not a technique of Long Range Forecasting? 

Detailed Solution for Test: Forecasting Routing & Scheduling - 2 - Question 5

Correlation and Regression method is used for short and medium range forecasting.  

Test: Forecasting Routing & Scheduling - 2 - Question 6

Which one of the following charts gives simultaneously, information about the progress of work and machine loading? 

Detailed Solution for Test: Forecasting Routing & Scheduling - 2 - Question 6

A man-machine chart graphically represents the relationship between the manual work performed by one or more operators and one or more machines involved in a manufacturing process.

Test: Forecasting Routing & Scheduling - 2 - Question 7

Assertion (A): Time series analysis technique of sales-forecasting can be applied to only medium and short-range forecasting.

Reason (R): Qualitative information about the market is necessary for long-range forecasting.  

Test: Forecasting Routing & Scheduling - 2 - Question 8

Which one of the following is required for the preparation of the load chart machine? 

Test: Forecasting Routing & Scheduling - 2 - Question 9

Which one of the following forecasting techniques is most suitable for making long range forecasts? 

Test: Forecasting Routing & Scheduling - 2 - Question 10

Despatching function of production planning and control refers to:  

Test: Forecasting Routing & Scheduling - 2 - Question 11

Which one of the following methods can be used for forecasting when a demand pattern is consistently increasing or decreasing? 

Test: Forecasting Routing & Scheduling - 2 - Question 12

Which one of the following statements is correct in relation to production, planning and control? 

Test: Forecasting Routing & Scheduling - 2 - Question 13

Which one of the following statements is correct? 

Test: Forecasting Routing & Scheduling - 2 - Question 14

Consider the following statement

Dispatching

1. Is the action of operations planning and control
2. Releases work to the operating divisions.
3. Conveys instructions to the shop floor.

Of these statements:  

Test: Forecasting Routing & Scheduling - 2 - Question 15

Given T = Underlying trend, C = Cyclic variations within the trend, S = Seasonal variation within the trend and R = Residual, remaining or random variation, as per the time series analysis of sales forecasting, the demand will be a function of: 

Detailed Solution for Test: Forecasting Routing & Scheduling - 2 - Question 15

Sale forecasting should not be influenced by the random variations in demand. 

Test: Forecasting Routing & Scheduling - 2 - Question 16

Which one of the following statements correctly defines the term ‘despatching’? 

Test: Forecasting Routing & Scheduling - 2 - Question 17

Which one of the following methods can be used for forecasting the sales potential of a new product? 

Test: Forecasting Routing & Scheduling - 2 - Question 18

In production, planning and control, the document which authorizes the start of an operation on the shop floor is the  

Test: Forecasting Routing & Scheduling - 2 - Question 19

Match List-I with List-II and select the correct answer using the codes given below the lists:


Test: Forecasting Routing & Scheduling - 2 - Question 20

The value engineering technique in which experts of the same rank assemble for product development is called 

Test: Forecasting Routing & Scheduling - 2 - Question 21

Assertion (A):  Moving average method of forecasting demand gives an account of the trends in fluctuations and suppresses day-to-day insignificant fluctuations.

Reason (R): Working out moving averages of the demand data smoothens the random day-to-day fluctuations and represents only significant variations.  

Test: Forecasting Routing & Scheduling - 2 - Question 22

Which one of the following is the preferred logical sequence in the development of a new product? 

Test: Forecasting Routing & Scheduling - 2 - Question 23

Which one of the following is a qualitative technique of demand forecasting? 

Test: Forecasting Routing & Scheduling - 2 - Question 24

Consider the follow aspect.

1. Functional
2. Operational
3. Aesthetic

Which of the above aspects is/are to be analyzed in connection with the product development?  

Test: Forecasting Routing & Scheduling - 2 - Question 25

Match List-I (Methods) with List-II (Problems) and select the correct answer using the codes given below the lists:

Test: Forecasting Routing & Scheduling - 2 - Question 26

Consider the following statements:

The immediate objective of a product is:
1. To simulate sales function
2. To utilize the existing equipment and power
3. To monopolize the market

Which of the above statements is/are correct?

Test: Forecasting Routing & Scheduling - 2 - Question 27

Using the exponential smoothing method of forecasting, what will be the forecast for the fourth week if the actual and forecasted demand for the third week is 480 and 500 respectively and α = 0·2?  

Detailed Solution for Test: Forecasting Routing & Scheduling - 2 - Question 27

Test: Forecasting Routing & Scheduling - 2 - Question 28

The following activities are to be performed in a particular sequence for routing a product

1. Analysis of the product and breaking it down into components
2. Determination of the lot size
3. Determination of operations and processing time requirement
4. Taking makes or buys decisions

The correct sequence of these activities is 

Test: Forecasting Routing & Scheduling - 2 - Question 29

The demand for a product in the month of March turned out to be 20 units against an earlier made forecast of 20 units. The actual demand for April and May turned to be 25 and 26 units respectively. What will be the forecast for the month of June, using exponential smoothing method and taking smoothing constant α as 0.2?  

Detailed Solution for Test: Forecasting Routing & Scheduling - 2 - Question 29

Test: Forecasting Routing & Scheduling - 2 - Question 30

Which of the following are the objectives of scheduling? 

1. Reducing average waiting time of a batch
2. To meet the deadline of order fulfillment
3. To improve quality of products
4. To increase facility utilization

Select the correct answer using the code given below:  

29 docs|220 tests
Information about Test: Forecasting Routing & Scheduling - 2 Page
In this test you can find the Exam questions for Test: Forecasting Routing & Scheduling - 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Forecasting Routing & Scheduling - 2, EduRev gives you an ample number of Online tests for practice