Mechanical Engineering Exam  >  Mechanical Engineering Questions  >  For cutting double start screw threads of pit... Start Learning for Free
For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of
[ME 1991]
  • a)
    0.5 mm/rev
  • b)
    1.0 mm/rev
  • c)
    2.0 mm/rev
  • d)
    4.0 mm/rev
Correct answer is option 'C'. Can you explain this answer?
Verified Answer
For cutting double start screw threads of pitch 1.0 mm on a lathe, the...
Pitch = 1mm
Start = Double Start
Feed rate = 2 × 1 = 2 mm/res.
View all questions of this test
Most Upvoted Answer
For cutting double start screw threads of pitch 1.0 mm on a lathe, the...
Pitch = 1mm
Start = Double Start
Feed rate = 2 × 1 = 2 mm/res.
Free Test
Community Answer
For cutting double start screw threads of pitch 1.0 mm on a lathe, the...
To cut double-start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of 2.0 mm/rev.

Thread cutting is the process of creating screw threads on a workpiece using a lathe. The feed rate of the cutting tool determines how fast the tool moves along the workpiece, which in turn determines the pitch of the threads.

Here's an explanation of why the correct answer is option 'C' (2.0 mm/rev):

1. Understanding the pitch of the screw threads:
- The pitch is the distance between adjacent threads on a screw.
- In this case, the pitch is given as 1.0 mm, which means that there is a 1.0 mm distance between the centerline of two adjacent threads.

2. Understanding double-start screw threads:
- Double-start threads have two threads winding around the screw axis instead of one.
- This means that for every revolution of the screw, the thread advances by two times the pitch.
- In other words, the distance traveled by the thread in one revolution is twice the pitch.

3. Determining the feed rate for double-start screw threads:
- The feed rate of the cutting tool is the distance the tool moves along the workpiece for one revolution of the workpiece.
- Since double-start threads have a thread advancement of two times the pitch for each revolution, the feed rate should also be two times the pitch.
- In this case, the given pitch is 1.0 mm, so the feed rate should be 2.0 mm/rev.

Therefore, the correct answer is option 'C' (2.0 mm/rev) because the feed rate of the thread cutting tool should be two times the pitch for cutting double-start screw threads.
Attention Mechanical Engineering Students!
To make sure you are not studying endlessly, EduRev has designed Mechanical Engineering study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Mechanical Engineering.
Explore Courses for Mechanical Engineering exam

Top Courses for Mechanical Engineering

For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer?
Question Description
For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? for Mechanical Engineering 2024 is part of Mechanical Engineering preparation. The Question and answers have been prepared according to the Mechanical Engineering exam syllabus. Information about For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? covers all topics & solutions for Mechanical Engineering 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer?.
Solutions for For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for Mechanical Engineering. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free.
Here you can find the meaning of For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer?, a detailed solution for For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? has been provided alongside types of For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice For cutting double start screw threads of pitch 1.0 mm on a lathe, the thread cutting tool should have a feed rate of[ME 1991]a)0.5 mm/revb)1.0 mm/revc)2.0 mm/revd)4.0 mm/revCorrect answer is option 'C'. Can you explain this answer? tests, examples and also practice Mechanical Engineering tests.
Explore Courses for Mechanical Engineering exam

Top Courses for Mechanical Engineering

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev