Which of the following data is not required to prepare an estimate?a)A...
Answer:
To prepare an estimate, various data and information are required. However, not all data are necessary for estimating the cost of a project. Among the options given, the data that is not required to prepare an estimate is the amplitude (option A).
Explanation:
To understand why amplitude is not required for estimating, let's briefly discuss the other options:
Drawings:
Drawings are an essential part of estimating because they provide a visual representation of the project. They include floor plans, elevations, sections, and other detailed drawings that help in understanding the scope of work and calculating the quantities of materials required.
Specifications:
Specifications outline the specific requirements and quality standards for the project. They provide detailed information about the materials to be used, construction methods, and other technical aspects. Estimators need specifications to accurately determine the cost of materials, labor, and equipment.
Rates:
Rates refer to the unit prices of various items and activities involved in the project. Estimators use rates to calculate the cost of materials, labor, and equipment based on the quantities obtained from the drawings and specifications. Rates are crucial for accurately estimating the total cost of a project.
Amplitude:
Amplitude, in the context of estimating, is not a relevant term or data. It typically refers to the maximum extent or measurement of a vibration or oscillation. In the construction estimation process, amplitude does not have any direct application or relevance. It is not a factor that affects the cost estimation or any other aspect of the project.
Therefore, among the given options, amplitude is the data that is not required to prepare an estimate. The other options, such as drawings, specifications, and rates, are essential components of the estimating process as they provide the necessary information for accurately calculating the cost of a construction project.
Which of the following data is not required to prepare an estimate?a)A...
For preparing an estimate, data such as drawings, detailed specifications, rates, etc. is required. The drawings needed to prepare the estimate include plans, sections, elevations, etc.
To make sure you are not studying endlessly, EduRev has designed Civil Engineering (CE) study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Civil Engineering (CE).