As per I.S. Code of Practice, concrete should be cured ata)5 Cb)10 Cc)...
Concrete Curing Temperature as per I.S. Code of Practice
Introduction
In civil engineering, curing is the process of maintaining the moisture and temperature conditions of freshly placed concrete for a specified period of time. This process ensures the hydration of cement particles, resulting in the development of strength and durability of the concrete. The Indian Standard (I.S.) Code of Practice for concrete curing provides guidelines for the temperature at which concrete should be cured.
I.S. Code of Practice
As per the I.S. Code of Practice, concrete should be cured at a temperature of 27°C. This temperature is considered ideal for the curing process as it promotes the proper hydration of cement and helps in achieving the desired strength and durability of the concrete.
Reasons for Curing at 27°C
There are several reasons why the I.S. Code of Practice recommends curing concrete at 27°C:
1. Optimum Hydration: The temperature of 27°C provides an optimal environment for the hydration process. Hydration is the chemical reaction between cement and water, which results in the formation of cementitious compounds. This reaction is exothermic, meaning it releases heat. By curing at 27°C, the heat generated during hydration is effectively trapped, ensuring complete and efficient hydration.
2. Accelerated Strength Gain: Curing at 27°C accelerates the strength gain of concrete. The higher temperature promotes faster chemical reactions, allowing the concrete to develop strength more quickly. This is especially beneficial in situations where early strength is desired, such as in fast-track construction projects or in cold weather conditions.
3. Reduced Risk of Thermal Cracking: Curing at 27°C helps to minimize the risk of thermal cracking in concrete. When concrete is exposed to high temperatures during curing, the outer layers can undergo rapid heat expansion while the inner layers remain relatively cooler. This temperature differential can lead to thermal stresses, causing cracks to develop. By maintaining a consistent curing temperature of 27°C, the risk of thermal cracking is significantly reduced.
4. Uniform Curing: Curing at 27°C ensures uniform curing throughout the concrete. This is important to achieve consistent strength and durability properties across the entire structure. Variations in curing temperature can result in uneven hydration and subsequent variations in concrete properties.
Conclusion
According to the I.S. Code of Practice, concrete should be cured at a temperature of 27°C. This temperature provides optimal conditions for hydration, accelerates strength gain, reduces the risk of thermal cracking, and ensures uniform curing. Following these guidelines is crucial to achieve the desired strength and durability of the concrete structure.
To make sure you are not studying endlessly, EduRev has designed Civil Engineering (CE) study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Civil Engineering (CE).