Question Description
The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? for Mechanical Engineering 2024 is part of Mechanical Engineering preparation. The Question and answers have been prepared
according to
the Mechanical Engineering exam syllabus. Information about The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? covers all topics & solutions for Mechanical Engineering 2024 Exam.
Find important definitions, questions, meanings, examples, exercises and tests below for The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer?.
Solutions for The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? in English & in Hindi are available as part of our courses for Mechanical Engineering.
Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free.
Here you can find the meaning of The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of
The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer?, a detailed solution for The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? has been provided alongside types of The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? theory, EduRev gives you an
ample number of questions to practice The height of the down-sprue is 175 mm and its cross-sectional area at the base is 200 mm2. The cross-sectional area of the horizontal runner is also 200 mm2. Assuming no losses, indicate the correct choice for the time (in seconds) required to fill a mould cavity of volume 106 mm3. (Use g = m/s2).a)2.67 b)8.45 c)26.72 d)84.50Correct answer is option 'B'. Can you explain this answer? tests, examples and also practice Mechanical Engineering tests.