Setup costs do not include 
  • a)
    Labour cost of setting up machines  
  • b)
    Ordering cost of raw material  
  • c)
    Maintenance cost of the machines  
  • d)
    Cost of processing the work piece 
Correct answer is option 'C'. Can you explain this answer?
Verified Answer
Setup costs do not includea)Labour cost of setting up machines b)Order...
Setup cost is the costs incurred to configure a machine for a production run. This cost is considered a fixed cost of the associated batch, so its cost is spread over the number of units produced. Setup costs include the following:

1. Labor to position tools and materials next to the machine
2. Labor to configure the machine
3. Scrap cost of test units run on the machine
View all questions of this test
Most Upvoted Answer
Setup costs do not includea)Labour cost of setting up machines b)Order...
Explanation:

Setup costs refer to the expenses incurred in preparing the machines, equipment, and tools for a specific production task. These costs are typically one-time expenses that are associated with the setup of a production line. The following are the details of the options given in the question:

Labour cost of setting up machines:
- When a production line is set up, it requires skilled labor to install and configure the machines, equipment, and tools for the specific task. This cost is included in the setup cost.

Ordering cost of raw material:
- Ordering cost of raw material refers to the cost incurred in placing and receiving an order of raw material. It includes the cost of communication, transportation, and inspection of the material. This cost is not included in the setup cost.

Maintenance cost of the machines:
- Maintenance cost of the machines refers to the cost incurred in keeping the machines, equipment, and tools in good working condition. This cost is not included in the setup cost, as it is an ongoing expense that is incurred throughout the production process.

Cost of processing the work piece:
- Cost of processing the work piece refers to the cost of converting the raw material into a finished product. This cost is not included in the setup cost, as it is an ongoing expense that is incurred throughout the production process.

Conclusion:

In conclusion, the correct answer to the given question is option 'C' i.e., Maintenance cost of the machines. Setup costs only include one-time expenses incurred in preparing the machines, equipment, and tools for a specific production task. Maintenance cost is an ongoing expense that is incurred throughout the production process.
Attention Mechanical Engineering Students!
To make sure you are not studying endlessly, EduRev has designed Mechanical Engineering study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Mechanical Engineering.
Explore Courses for Mechanical Engineering exam

Top Courses for Mechanical Engineering

Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer?
Question Description
Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? for Mechanical Engineering 2024 is part of Mechanical Engineering preparation. The Question and answers have been prepared according to the Mechanical Engineering exam syllabus. Information about Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? covers all topics & solutions for Mechanical Engineering 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer?.
Solutions for Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for Mechanical Engineering. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free.
Here you can find the meaning of Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer?, a detailed solution for Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? has been provided alongside types of Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Setup costs do not includea)Labour cost of setting up machines b)Ordering cost of raw material c)Maintenance cost of the machines d)Cost of processing the work pieceCorrect answer is option 'C'. Can you explain this answer? tests, examples and also practice Mechanical Engineering tests.
Explore Courses for Mechanical Engineering exam

Top Courses for Mechanical Engineering

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev