Methods of contouring:

The method of establishing / plotting contours in a plan or map is known as contouring. It requires planimetric position of the points and drawing of contours from elevations of the plotted points. Contouring involves providing of vertical control for location of points on the contours and horizontal control for planimetric plotting of points. Thus, contouring depends upon the instruments used (to determine the horizontal as well as vertical position of points). In general, the field methods of contouring may be divided into two classes:

  1. Direct methods
  2. Indirect methods
Methods of Contouring - Contours, Surveying and Levelling | Surveying and Levelling Notes- Agricultural Engg - Agricultural Engineering  View Answer

Direct Method:

In the direct method, the contour to be plotted is actually traced on the ground. Points which happen to fall on a desired contour are only surveyed, plotted and finally joined to obtain the particular contour. This method is slow and tedious and thus used for large scale maps, small contour interval and at high degree of precision. 

Vertical control : 

In this method, a benchmark is required in the project area. The level is set up on any commanding position and back sight is taken on the bench mark. Let the back sight reading on the bench mark be 1.485 m. If the reduced level of the bench mark is 100 m, the height of instrument would be 100 + 1.485 = 101.485 m.

To locate the contour of 100.5 m value, the staff man is directed to occupy the position on the ground where the staff reading is 101.485 -100.500 = 0.985 m. Mark all such positions on the ground where the staff reading would be 0.985 m by inserting pegs. Similarly locate the points where the staff reading would be 101.485 -101 = 0.485 m for 101m contour.

The contour of 101.5 m cannot be set from this setting of the instrument because the height of instrument for this setting of the instrument is only 101.485 m. Therefore, locating contours of higher value, the instrument has to be shifted to some other suitable position.

Establish a forward station on a firm ground and take fore sight on it. This point acts as a point of known elevation, for shifting the position of the instrument to another position, from where the work proceeds in the similar manner till the entire area is contoured.

Horizontal control :

The horizontal control is generally provided by method of plane table surveying or locating the positions of points.

Indirect method of contouring:

In this method, the spot levels of selected guide points are taken with a level and their levels are computed. The horizontal positions of these points are measured or computed and the points are plotted on the plan. The contours are then drawn by a process called interpolation of contours from the levels of the guide points. The following are the indirect methods are commonly used for locating contours.

  1. Squares or Grid method
  2. Cross section method

Square or grid method:

In this method, the area to be surveyed is divided into a grid or series of squares. The grid size may vary from 5 m x 5 m to 25 m x 25 m depending upon the nature of the terrain, the contour interval required and the scale of the map desired. Also, the grids may not be of the same size throughout but may vary depending upon the requirement and field conditions. The grid corners are marked on the ground and spot levels of these comers are determined by leveling. The grid is plotted to the scale of the map and the spot levels of the grid corners are entered. The contours of desired values are then located by interpolation. Special care should be taken to give the spot levels to the salient features of the ground such as hilltops, deepest points of the depressions, and their measurements from respective corners of the grids, for correct depiction of the features. The method is used for large scale mapping and at average precision. 

Cross section method:

In these sections, a base line, centre line or profile line is considered.  Cross sections are taken perpendicular to this line at regular intervals.  After this points are marked along the cross sections at regular intervals.  A temporary bench mark is set up near the site.  Staff readings are taken along the base line and the cross sections. The readings are entered in the level book the base line and the cross sections should also be mentioned.  The RL of each of the points calculated.  Then the base line and cross sections are plotted to a suitable scale.  Subsequently the RLs of the respective points are noted on the map, after which the required contour line is drawn by interpolation

This method is suitable for route survey, when cross sections are taken transverse to the longitudinal section.

The document Methods of Contouring - Contours, Surveying and Levelling | Surveying and Levelling Notes- Agricultural Engg - Agricultural Engineering is a part of the Agricultural Engineering Course Surveying and Levelling Notes- Agricultural Engg.
All you need of Agricultural Engineering at this link: Agricultural Engineering
45 docs

FAQs on Methods of Contouring - Contours, Surveying and Levelling - Surveying and Levelling Notes- Agricultural Engg - Agricultural Engineering

1. What is contouring in surveying?
Ans. Contouring in surveying is a technique used to determine the shape and elevation of the land by measuring and plotting contour lines on a map. Contour lines connect points of equal elevation, allowing engineers and surveyors to understand the topography of an area.
2. How is contouring useful in agricultural engineering?
Ans. Contouring is highly beneficial in agricultural engineering as it helps in designing efficient irrigation systems, preventing soil erosion, and optimizing land use. By understanding the contours of the land, engineers can plan irrigation channels and terraces in a way that maximizes water distribution and minimizes run-off, leading to improved crop productivity.
3. What are the different methods of contouring?
Ans. There are several methods of contouring in surveying and agricultural engineering. Some commonly used methods include the grid method, the direct method, the radial method, and the graphical method. Each method has its own advantages and is chosen based on the specific requirements of the project.
4. How is levelling related to contouring in agricultural engineering?
Ans. Levelling is closely related to contouring in agricultural engineering as it helps determine the height variations across the land. Levelling techniques, such as differential levelling, are used to measure the difference in elevation between points, which is essential for accurately establishing contour lines and understanding the topography of the land.
5. Can contouring be done manually or is it done using specialized equipment?
Ans. Contouring can be done manually using traditional surveying techniques, such as using a theodolite or a total station. However, to achieve more precise and efficient results, specialized equipment like GPS receivers and laser scanners are often used in modern contouring practices. These advanced technologies help in accurately capturing data and generating detailed contour maps.
45 docs
Download as PDF
Explore Courses for Agricultural Engineering exam
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev
Related Searches

ppt

,

Objective type Questions

,

Methods of Contouring - Contours

,

Important questions

,

Sample Paper

,

Methods of Contouring - Contours

,

video lectures

,

Summary

,

Surveying and Levelling | Surveying and Levelling Notes- Agricultural Engg - Agricultural Engineering

,

Previous Year Questions with Solutions

,

Surveying and Levelling | Surveying and Levelling Notes- Agricultural Engg - Agricultural Engineering

,

study material

,

Exam

,

mock tests for examination

,

Methods of Contouring - Contours

,

pdf

,

practice quizzes

,

MCQs

,

shortcuts and tricks

,

Semester Notes

,

Extra Questions

,

Surveying and Levelling | Surveying and Levelling Notes- Agricultural Engg - Agricultural Engineering

,

Free

,

Viva Questions

,

past year papers

;