Test: Runoff - 1 for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Test: Runoff - 1 questions and answers have been prepared according to the Civil Engineering (CE) exam syllabus.The Test: Runoff - 1 MCQs are made for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Runoff - 1 below.
Solutions of Test: Runoff - 1 questions in English are available as part of our course for Civil Engineering (CE) & Test: Runoff - 1 solutions in Hindi for Civil Engineering (CE) course. Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free. Attempt Test: Runoff - 1 | 10 questions in 30 minutes | Mock test for Civil Engineering (CE) preparation | Free important questions MCQ to study for Civil Engineering (CE) Exam | Download free PDF with solutions
Test: Runoff - 1 - Question 1

Direct runoff is made up of

Detailed Solution for Test: Runoff - 1 - Question 1

Direct runoff is that part of runoff which enters the stream immediately after the precipitation. It includes surface runoff, prompt interflow and precipitation on the channel surface.

Test: Runoff - 1 - Question 2

A hydrograph is a plot of

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Runoff - 1 - Question 3

The term base flow denotes

Detailed Solution for Test: Runoff - 1 - Question 3

The delayed flow that reaches a stream essentially as groundwater flow is called base flow.

Test: Runoff - 1 - Question 4

Virgin flow is

Detailed Solution for Test: Runoff - 1 - Question 4

A stream flow unaffected by works of man, such as structures for storage and diversion on a stream is called virgin flow.

Test: Runoff - 1 - Question 5

An ephemeral stream

Test: Runoff - 1 - Question 6

An intermittent stream

Detailed Solution for Test: Runoff - 1 - Question 6

An intermittent stream has limited contribution from the groundwater. During the wet season the water table is above the stream bed and there is a contribution of the base flow to the stream flow.

Test: Runoff - 1 - Question 7

The flow-duration curve is a plot of

Detailed Solution for Test: Runoff - 1 - Question 7

A flow-duration curve of a stream is a plot of discharge against the per cent of time the flow was equalled or exceeded. This curve is also known as discharge frequency curve.

Test: Runoff - 1 - Question 8

In a flow-mass curve study the demand line drawn from a ridge in the curve did not interest the mass curve again. This represents that

Test: Runoff - 1 - Question 9

If in a flow-mass curve, a demand line drawn tangent to the lowest point in a valley of the cure does not intersect the mass curve at an earlier time period, it represents that

Test: Runoff - 1 - Question 10

The flow-mass curve is an integral curve of

Detailed Solution for Test: Runoff - 1 - Question 10

The flow mass curve is a plot of the cumulative discharge volume against time plotted in chronological order. The ordinate of the mass curve, V at any time t is,

Since the hydrograph is a plot of Q vs t, it is easy that the flow mass curve is an integral curve of the hydrograph.

Information about Test: Runoff - 1 Page
In this test you can find the Exam questions for Test: Runoff - 1 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Runoff - 1, EduRev gives you an ample number of Online tests for practice

Top Courses for Civil Engineering (CE)

Download as PDF

Top Courses for Civil Engineering (CE)