Mechanical Engineering Exam  >  Mechanical Engineering Tests  >  Test: Loading & Scheduling - 2 - Mechanical Engineering MCQ

Test: Loading & Scheduling - 2 - Mechanical Engineering MCQ


Test Description

10 Questions MCQ Test - Test: Loading & Scheduling - 2

Test: Loading & Scheduling - 2 for Mechanical Engineering 2024 is part of Mechanical Engineering preparation. The Test: Loading & Scheduling - 2 questions and answers have been prepared according to the Mechanical Engineering exam syllabus.The Test: Loading & Scheduling - 2 MCQs are made for Mechanical Engineering 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Loading & Scheduling - 2 below.
Solutions of Test: Loading & Scheduling - 2 questions in English are available as part of our course for Mechanical Engineering & Test: Loading & Scheduling - 2 solutions in Hindi for Mechanical Engineering course. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free. Attempt Test: Loading & Scheduling - 2 | 10 questions in 30 minutes | Mock test for Mechanical Engineering preparation | Free important questions MCQ to study for Mechanical Engineering Exam | Download free PDF with solutions
Test: Loading & Scheduling - 2 - Question 1

Match phrases in List-I with List-Il:
List-I
A. Lead time forecast
B. Master production schedule
C. Payback period
D. Early start schedule
List-Il
1. Material requirement planning
2. Financial appraisal
3. Project planning
4. Inventory control

Test: Loading & Scheduling - 2 - Question 2

Match the List-I with List-Il most appropriately:
List-I
A. Strategic decision
B. Bullwhip effect
C. Flexible manufacturing system
D. Tactical decision
E. Operational decision
List-II
1. Production scheduling
2. Reduce manufacturing lead time
3. Plant layout
4. Price fluctuations
5. Inventory policies

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Loading & Scheduling - 2 - Question 3

Which of the following is TRUE regarding services scheduling?

Test: Loading & Scheduling - 2 - Question 4

Which of these is not part of the planning files of a production planning and control system?

Test: Loading & Scheduling - 2 - Question 5

In production, planning and control, the document which authorizes the start of an operation on the shop floor is the:

Test: Loading & Scheduling - 2 - Question 6

Which of the following are tools of shop floor control?

Test: Loading & Scheduling - 2 - Question 7

Which one of the following is not a function of production control?

Detailed Solution for Test: Loading & Scheduling - 2 - Question 7

Routing, scheduling and dispatching are the function of production control.

Test: Loading & Scheduling - 2 - Question 8

The function which authorizes production as well as control is

Test: Loading & Scheduling - 2 - Question 9

Chart which is useful for scheduling and control is

Test: Loading & Scheduling - 2 - Question 10

Determination of the sequence of operations to be performed and the allocation of facilities where these operations are to be performed is

Information about Test: Loading & Scheduling - 2 Page
In this test you can find the Exam questions for Test: Loading & Scheduling - 2 solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Loading & Scheduling - 2, EduRev gives you an ample number of Online tests for practice

Top Courses for Mechanical Engineering

Download as PDF

Top Courses for Mechanical Engineering