Civil Engineering (CE) Exam  >  Civil Engineering (CE) Tests  >  Test: Labour and Rate Analysis - Civil Engineering (CE) MCQ

Test: Labour and Rate Analysis - Civil Engineering (CE) MCQ


Test Description

10 Questions MCQ Test - Test: Labour and Rate Analysis

Test: Labour and Rate Analysis for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Test: Labour and Rate Analysis questions and answers have been prepared according to the Civil Engineering (CE) exam syllabus.The Test: Labour and Rate Analysis MCQs are made for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, notes, meanings, examples, exercises, MCQs and online tests for Test: Labour and Rate Analysis below.
Solutions of Test: Labour and Rate Analysis questions in English are available as part of our course for Civil Engineering (CE) & Test: Labour and Rate Analysis solutions in Hindi for Civil Engineering (CE) course. Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free. Attempt Test: Labour and Rate Analysis | 10 questions in 30 minutes | Mock test for Civil Engineering (CE) preparation | Free important questions MCQ to study for Civil Engineering (CE) Exam | Download free PDF with solutions
Test: Labour and Rate Analysis - Question 1

Which of the following is not a classification of labour?

Detailed Solution for Test: Labour and Rate Analysis - Question 1

Labour is classified into skilled first-class, skilled second class and unskilled. The purpose of analysis of rates is for working out the economical use of materials and the actual cost of per unit of the items.

Test: Labour and Rate Analysis - Question 2

What is printed list of rates of various items of work maintained by the engineering department?

1 Crore+ students have signed up on EduRev. Have you? Download the App
Test: Labour and Rate Analysis - Question 3

Purposes of rate analysis are
a. To determine the current rate per unit of an item at the locality
b. To examine the viability of rates offered by contractors
c. To calculate the quantity of materials and labour strength required for project planning
d. To fix labour contract rates 

Detailed Solution for Test: Labour and Rate Analysis - Question 3

Purpose of Analysis of rates: 

  • To work out the actual cost per unit of the items at the locality.
  • To examine the viability of rates offered by contractors
  • To calculate the number of materials and labour strength required for project planning
  • To fix labour contract rates
  • To work out the economical use of materials and processes in completing the particulars item.
  • To work out the cost of extra items which are not provided in the contract bond, but are to be done as per the directions of the department.
  • To revise the schedule of rates due to an increase in the cost of material and labour or due to a change in technique. 

Additional Information
Cost of labour -types of labour, standard schedule of rates: 

  • The labour can be classified into 1) Skilled – 1st class 2) Skilled – 2d Class 3) Unskilled
  • The labour charges can be obtained from the standard schedule of rates 30% of the skilled labour provided in the data may be taken as Ist class, remaining 70% as II class.
  • The rates of materials for Government works are fixed by the superintendent Engineer for his circle every year and approved by the Board of Chief Engineers. These rates are incorporated in the standard schedule of rates. 
Test: Labour and Rate Analysis - Question 4

The concrete used for cement concrete roads is of grade ___________

Detailed Solution for Test: Labour and Rate Analysis - Question 4

The concrete used for cement concrete roads is of grade M 15 using 20 mm hand broken grade metal. For base course, concrete of 1:4:8 is used using 40 mm HBG metal.

Test: Labour and Rate Analysis - Question 5

What is the area by Simpsons rule?
Rate Analysis - Draughtsman Civil

Test: Labour and Rate Analysis - Question 6

Which of the following is the correct order of stages of estimation of concrete roads?

Detailed Solution for Test: Labour and Rate Analysis - Question 6

The correct order of stages of estimation of concrete roads is earth work excavations, cement concrete for the base course (1:4:8) and cement concrete for wearing course (1:2:8). Cement concrete road is laid over an existing Water Bound Macadam road.

Test: Labour and Rate Analysis - Question 7

The rates of materials used for government works are approved by _________

Detailed Solution for Test: Labour and Rate Analysis - Question 7

The Board of Chief Engineers approves the rates of materials used for government works. However, every year, these are fixed by the Superintendent Engineer.

Test: Labour and Rate Analysis - Question 8

Calculate the number of cement bags required for 2500 kg of cement.

Detailed Solution for Test: Labour and Rate Analysis - Question 8

The weight of one cement bag is 50 kg. Therefore, the number of cement bags required for 2500 kg of cement is 2500/50 i.e. 50 bags.

Test: Labour and Rate Analysis - Question 9

The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is ___________

Detailed Solution for Test: Labour and Rate Analysis - Question 9

Approximately 1.52 m3 of dry concrete is required for 1 m3 of wet concrete. The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is [2/(1+2+4)] x 1.52 x 15 m3 i.e. 6.51 m3.

Test: Labour and Rate Analysis - Question 10

The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is ________

Detailed Solution for Test: Labour and Rate Analysis - Question 10

The ratio 1:3:6 is for cement, sand and coarse aggregate. Therefore, the quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is [6/(1+3+6)] x 1.52 x 20 m3 i.e. 18.24 m3.

Information about Test: Labour and Rate Analysis Page
In this test you can find the Exam questions for Test: Labour and Rate Analysis solved & explained in the simplest way possible. Besides giving Questions and answers for Test: Labour and Rate Analysis, EduRev gives you an ample number of Online tests for practice

Top Courses for Civil Engineering (CE)

Download as PDF

Top Courses for Civil Engineering (CE)