A piece of work can be done by 6 men and 5 women in 6 days or 3 men and 4 women in 10 days. It can be done by 9 men and 15 women in how many days ?
A works twice as fast as B. if both of them can together finish a work in 12 days, B alone can do it in.
1 Crore+ students have signed up on EduRev. Have you? Download the App |
A alone can complete a work in 12 days, while A and B together can complete the same work in 8 days. The number of days that B will take to complete the work alone is
A work could be completed in 100 days. Due to the absence of 10 workers it was completed in 110 days. The original number of workers was
A can do a job in 15 days B in 10 days and C in 30 days. If A is helped by B and C on every third day, the job will be completed in
Certain number of men can complete a job in 30 days. If there were 5 more men, it could be completed in 10 days less. How many men were there in the beginning?
A man is paid Rs. 20 for each day he works and loses Rs. 3 for each day he is idle. At the end of 60 days he gets Rs. 280. Then he was idle for
A takes twice as much time as B or thrice as much time as C to finish a piece of work; working together they can finish the work in 2 days. In how many days B can do the work alone?
4 men and 6 women can complete a work in 8 days while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete the work.
72 men can build a wall 280 m long in 21 days. How many men will take 18 days to build a similar type of a wall of length 100 m.
Prem and Sham can do a job together in 7 days. Sham is 1¾ times more efficient than Prem. Same job can be done by sham alone in
If 3 men or 4 women can plough a field in 43 days, how long will 7 men and 5 women take to plough it.
8 men can do a work in 12 days. After 6 days of work four more men were employed. In how many days would the remaining work be done.
A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but left after 3 days. The remaining work will be done by A in
A can do a work in the same time as B and C together can do it. If A and B together can do it in 10 days and C alone in 50 days, then B alone can do the work in
A and B can do a work in 12 days, B and C in 15 days, C and A in 20 days. A alone can do the work in
If 12 men and 16 boys can do a piece work in 5 days, 13 men and 24 boys can do it in four days then the ratio of the work done daily by a man and a boy is?
A and B can weave a carpet in 10 days and 15 days respectively. They begin to work together but B leaves after 2 days. In what time will A complete the remaining work.
Ram can do ¼ of the work in 3 days and Sham can do 1/6 of the same work in 4 days. How much will Ram get if both work together and are paid Rs. 180 in all.
A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in: