Direct ranging is possible only when the end stations are:a)Close to e...
The process of establishing or developing intermediate points between two terminal points or end points on a straight line is known as ranging.
Direct Ranging: The ranging in which intermediate ranging rods are placed in a straight line by direct observation from either end.
Direct ranging is possible only when the end stations are intervisible.
View all questions of this test
Most Upvoted Answer
Direct ranging is possible only when the end stations are:a)Close to e...
Direct Ranging in Surveying

Direct ranging is a method of surveying used to measure distances between two points without using any intermediate points. In this method, the end stations must be mutually intervisible, which means they must have a clear line of sight to each other.

Importance of Mutually Intervisibility

The reason why mutually intervisibility is important for direct ranging is that it ensures that there are no obstructions between the two end stations. If there are obstructions, such as buildings or trees, the direct line of sight between the two stations will be blocked, and direct ranging will not be possible.

Limitations of Direct Ranging

While direct ranging is a useful method of surveying, it does have its limitations. These include:

- Distance limitations: Direct ranging is only effective for measuring distances up to around 1 km.
- Accuracy limitations: Direct ranging is not as accurate as other surveying methods, such as triangulation or trilateration.
- Weather limitations: Direct ranging can be affected by atmospheric conditions, such as fog or haze, which can reduce visibility.

Conclusion

In conclusion, direct ranging is a useful method of surveying for measuring distances between two points without using intermediate points. However, it is important that the end stations are mutually intervisible to ensure that there are no obstructions between them. Direct ranging has its limitations, including distance and accuracy limitations, and it can be affected by weather conditions.
Free Test
Community Answer
Direct ranging is possible only when the end stations are:a)Close to e...
Obtion 3 r correct
Explore Courses for Civil Engineering (CE) exam
Question Description
Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? for Civil Engineering (CE) 2025 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2025 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer?.
Solutions for Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer?, a detailed solution for Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? has been provided alongside types of Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Direct ranging is possible only when the end stations are:a)Close to each otherb)Not more than 100 m apartc)Mutually intervisibled)Located at highest point in the sea.Correct answer is option 'C'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev