According to I.S. specifications concrete should be cured under a humi...
Curing of cement concrete is defined as the process of maintaining the moisture and temperature conditions of concrete for hydration reaction to normal so that concrete develops hardened properties over time.
The time to start curing of concrete depends on the evaporation rate of moisture from the concrete. The evaporation rate is influenced by wind, radiant energy from sunshine, concrete temperature, climatic conditions, relative humidity.
According to Indian standard specification,
Concrete should be cured under a humidity of 90%.
View all questions of this test
According to I.S. specifications concrete should be cured under a humi...
Concrete Curing and Humidity
Concrete curing is a crucial process that involves maintaining the appropriate conditions for the hydration and hardening of concrete. One of the important factors to consider during the curing process is the humidity level. The appropriate humidity level ensures that the concrete retains sufficient moisture for proper curing and strength development. According to I.S. specifications, concrete should be cured under a humidity of 90%.
Importance of Curing
Curing plays a vital role in the overall quality and durability of concrete. Proper curing helps to:
1. Promote hydration: Hydration is the chemical reaction between cement and water, which leads to the hardening and strength development of concrete. Maintaining the required humidity level ensures the availability of sufficient moisture for the hydration process.
2. Prevent moisture loss: Concrete has a high water-to-cement ratio initially, and it tends to lose moisture rapidly. If not properly cured, the concrete surface may dry out quickly, leading to the formation of shrinkage cracks and reduced strength.
3. Enhance strength development: Adequate curing allows the concrete to gain strength over time. It helps to achieve the desired compressive and tensile strengths, making the concrete more durable and resistant to various environmental factors.
Humidity Level for Concrete Curing
The I.S. specifications recommend a humidity level of 90% for concrete curing. This high humidity level ensures that the concrete surface remains moist, preventing rapid moisture loss. It allows sufficient time for the hydration process to occur and for the concrete to gain strength.
Other Factors Affecting Curing
While humidity is an important factor in concrete curing, it should be noted that other factors also influence the overall curing process. These include:
1. Temperature: Higher temperatures generally accelerate the hydration process, while lower temperatures slow it down. It is important to control the temperature during curing to ensure optimal strength development.
2. Duration: Concrete curing should continue for a specific period to achieve the desired strength. The curing duration depends on several factors such as mix design, ambient conditions, and project requirements.
3. Moisture retention: In addition to humidity, it is essential to prevent moisture loss from the concrete surface. This can be achieved by using curing compounds, plastic sheets, or wet burlap to cover the concrete and maintain moisture levels.
Conclusion
In conclusion, according to I.S. specifications, concrete should be cured under a humidity level of 90%. This high humidity ensures that the concrete retains sufficient moisture for proper hydration, preventing shrinkage cracks and promoting strength development. However, it is important to consider other factors such as temperature, curing duration, and moisture retention methods to ensure effective concrete curing and achieve the desired quality and durability.