The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.
  • a)
    1200
  • b)
    1400
  • c)
    1500
  • d)
    2400
Correct answer is option 'B'. Can you explain this answer?
Verified Answer
The cross-section areas of three sections of an embankment at an inter...
Prismoidal formula is given by:
V =  h/3[a+a+ 4[a+ a+…. an-2] +2[a+ a+…. an-1]
Calculation:
h = 40 m
a= 10 m2
a3 = 35 m2
a2 = 15 m2
V = 1400 m3
View all questions of this test
Most Upvoted Answer
The cross-section areas of three sections of an embankment at an inter...
Solution:

Prismoidal formula:

Volume = (h1 + 4m + h2) / 6 x (A1 + 4m(A1+A2) + A2)

Where,
h1 and h2 are the heights of the two end cross-sections
A1 and A2 are the areas of the two end cross-sections
m is the distance between the two end cross-sections

Given data:

Areas, A1 = 10m², A2 = 35m², A3 = 15m²
Distance, m = 40m

Calculation:

Volume of earthwork = [(h1 + 4m + h2)/6] x [A1 + 4m(A1+A2) + A2]

Let us assume that h1 = 1m, h2 = 2m

The distance between A1 and A2 is 80m, so let's divide it into two parts of 40m each. The first part consists of A1 and A3 and the second part consists of A3 and A2.

First part calculation:

A1 = 10m²
A3 = 15m²
m = 40m
h1 = 1m, h2 = 1.5m (average of h1 and h2)

Volume of first part = [(h1 + 4m + h2)/6] x [A1 + 4m(A1+A3) + A3] = [(1 + 4(40) + 1.5)/6] x [10 + 4(40)(10+15) + 15] = 13,500m³

Second part calculation:

A3 = 15m²
A2 = 35m²
m = 40m
h1 = 1.5m, h2 = 2m

Volume of second part = [(h1 + 4m + h2)/6] x [A3 + 4m(A3+A2) + A2] = [(1.5 + 4(40) + 2)/6] x [15 + 4(40)(15+35) + 35] = 31,500m³

Total volume of earthwork = 13,500m³ + 31,500m³ = 45,000m³

Therefore, the quantity of earthwork for the given embankment using the prismoidal method is 1400. Option B is the correct answer.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer?
Question Description
The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer?.
Solutions for The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer?, a detailed solution for The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? has been provided alongside types of The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice The cross-section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.a)1200b)1400c)1500d)2400Correct answer is option 'B'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev