The pipe mains carrying water from the source to the reservoir are des...
The pipe mains carrying water from the source to the reservoir are designed for the maximum daily draft = 1.8 times the average daily draft.
However, pipes for distributing water to households etc. are designed for maximum hourly draft of the maximum day = 2.7 times the average daily draft.
View all questions of this test
The pipe mains carrying water from the source to the reservoir are des...
**Answer:**
Water distribution systems typically consist of various components, including pipe mains, which transport water from the source to the reservoir or directly to consumers. The design of these pipe mains is a critical aspect of water distribution system planning and engineering.
The question asks specifically about the design of pipe mains carrying water from the source to the reservoir. In this context, the design objective is to ensure that the pipe mains have sufficient capacity to handle the maximum daily draft of water.
**Maximum Daily Draft:**
The maximum daily draft refers to the highest volume of water that is expected to be withdrawn from the water source and transported to the reservoir in a single day. This volume includes all the water demands from consumers and any additional requirements for system operation and maintenance.
Designing the pipe mains for the maximum daily draft ensures that they can accommodate the peak water demand and prevent any bottlenecks or pressure drops in the system. It ensures that there is sufficient capacity to transport the required volume of water from the source to the reservoir, even during periods of high demand.
**Reasons for Choosing Maximum Daily Draft:**
1. **Peak Demand:** The maximum daily draft represents the peak demand for water in a day. By designing the pipe mains for this peak demand, the system can handle all the water requirements during periods of high consumption.
2. **System Flexibility:** Designing for the maximum daily draft allows for system flexibility. It ensures that the pipe mains have enough capacity to handle variations in demand throughout the day, including peak usage periods.
3. **Reservoir Management:** Designing for the maximum daily draft also considers the capacity of the reservoir. By ensuring that the pipe mains can deliver the maximum daily draft, the reservoir can be effectively managed to meet the demands of consumers and maintain system reliability.
4. **Future Growth:** Designing for the maximum daily draft also takes into account potential future growth in water demand. It provides a buffer for accommodating any increases in demand without requiring major modifications to the pipe mains.
In conclusion, the pipe mains carrying water from the source to the reservoir are designed for the maximum daily draft to ensure that they can handle the peak water demand, provide system flexibility, manage the reservoir effectively, and accommodate future growth in demand.
The pipe mains carrying water from the source to the reservoir are des...
Sir eska ans to C hona chahiye,,,, because india me hamesha maximum hourly demand hi li jati hai most cases me,,,,,ye GOI manual code me bhi likha hai
To make sure you are not studying endlessly, EduRev has designed Civil Engineering (CE) study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Civil Engineering (CE).