Which of the following is not an assumption of scheduling and sequencing?
  • a)
    Set-up time is neglected
  • b)
    Jobs are ready for processing
  • c)
    Breakdowns are neglected
  • d)
    Waiting time for jobs is neglected
Correct answer is option 'D'. Can you explain this answer?
Most Upvoted Answer
Which of the following is not an assumption of scheduling and sequenc...
Assumptions of Scheduling and Sequencing

Scheduling and sequencing refer to the processes of determining the order in which jobs or tasks will be processed in a manufacturing or production environment. Several assumptions are made when scheduling and sequencing, including:

1. Set-up time is neglected: This assumption means that the time required to set up a machine or production line for a new job is not taken into account when scheduling and sequencing.

2. Jobs are ready for processing: This assumption means that all the necessary materials, tools, and resources required to process a job are available and ready before scheduling and sequencing.

3. Breakdowns are neglected: This assumption means that the possibility of equipment breakdown or failure during production is not taken into account when scheduling and sequencing.

4. Waiting time for jobs is neglected: This assumption means that the time a job spends waiting to be processed or waiting for resources is not taken into account when scheduling and sequencing.

Not an Assumption of Scheduling and Sequencing

D. Waiting time for jobs is neglected: This is not an assumption of scheduling and sequencing. Waiting time is an important consideration when scheduling and sequencing as it affects the overall efficiency and productivity of the production process. Scheduling and sequencing should aim to minimize waiting time as much as possible to ensure timely delivery of products and optimal use of resources.

In conclusion, waiting time for jobs is not an assumption of scheduling and sequencing, and it is important to consider it when determining the order in which jobs are processed.
Attention Mechanical Engineering Students!
To make sure you are not studying endlessly, EduRev has designed Mechanical Engineering study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Mechanical Engineering.
Explore Courses for Mechanical Engineering exam

Top Courses for Mechanical Engineering

Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer?
Question Description
Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? for Mechanical Engineering 2024 is part of Mechanical Engineering preparation. The Question and answers have been prepared according to the Mechanical Engineering exam syllabus. Information about Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? covers all topics & solutions for Mechanical Engineering 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer?.
Solutions for Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? in English & in Hindi are available as part of our courses for Mechanical Engineering. Download more important topics, notes, lectures and mock test series for Mechanical Engineering Exam by signing up for free.
Here you can find the meaning of Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer?, a detailed solution for Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? has been provided alongside types of Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Which of the following is not an assumption of scheduling and sequencing?a) Set-up time is neglectedb) Jobs are ready for processingc) Breakdowns are neglectedd) Waiting time for jobs is neglectedCorrect answer is option 'D'. Can you explain this answer? tests, examples and also practice Mechanical Engineering tests.
Explore Courses for Mechanical Engineering exam

Top Courses for Mechanical Engineering

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev