In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.?
Most Upvoted Answer
In order to have better utilization of hydro power potential, the plan...
**Utilization of Hydro Power Potential**

Hydro power is a clean and renewable source of energy that can contribute significantly to meeting the world's energy demands. In order to have better utilization of hydro power potential, various types of hydro power plants can be installed. Four commonly used types of hydro power plants are:

**1. Run-of-River Plants:**
Run-of-river plants are designed to utilize the natural flow of the river without the need for a large reservoir. These plants divert a portion of the river's flow through a powerhouse, where the water passes through turbines to generate electricity. The main advantage of run-of-river plants is their minimal environmental impact as they do not require the construction of large dams or reservoirs. They are suitable for locations with a consistent and reliable flow of water.

**2. Reservoir Power Plants:**
Reservoir power plants, also known as storage hydro power plants, involve the construction of large dams to create reservoirs. Water is stored in the reservoir during periods of excess flow and released through turbines during peak demand periods to generate electricity. The stored water acts as a buffer, allowing these plants to provide a steady and reliable power supply, irrespective of variations in river flow. Reservoir power plants are particularly suitable for locations with significant seasonal variations in water availability.

**3. Base Load Plants:**
Base load plants are designed to operate at a constant output level, providing a continuous supply of electricity to meet the minimum demand requirements. These plants are typically large in size and utilize a combination of reservoirs and run-of-river systems. They are strategically located to ensure a reliable and consistent power supply. Base load plants are essential for meeting the base load demand and can provide a stable source of electricity for industrial, commercial, and residential sectors.

**4. Pumped Storage Plants:**
Pumped storage plants are a type of hydro power plant that combines both a reservoir and a run-of-river system. These plants store excess electricity during periods of low demand by using it to pump water from a lower reservoir to an upper reservoir. During periods of peak demand, the stored water is released back into the lower reservoir, passing through turbines to generate electricity. Pumped storage plants are highly efficient and can quickly respond to fluctuations in demand, making them ideal for balancing the grid and providing stability to the overall power system.

In conclusion, the better utilization of hydro power potential can be achieved by installing a combination of run-of-river, reservoir, base load, and pumped storage plants. Each type of plant has its own advantages and suitability depending on factors such as water availability, demand patterns, and environmental considerations. By utilizing a diverse mix of hydro power plants, we can harness the full potential of this renewable energy source and contribute to a sustainable and clean energy future.
Explore Courses for Civil Engineering (CE) exam

Similar Civil Engineering (CE) Doubts

Top Courses for Civil Engineering (CE)

In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.?
Question Description
In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.?.
Solutions for In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? defined & explained in the simplest way possible. Besides giving the explanation of In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.?, a detailed solution for In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? has been provided alongside types of In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? theory, EduRev gives you an ample number of questions to practice In order to have better utilization of hydro power potential, the plants to be installed should be (1) run of river plants (2) reservoir power plants (3) base load plants (4) pumped storage plants.? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev