Civil Engineering (CE) Exam  >  Civil Engineering (CE) Questions  >  The minimum depth of upstream and downstream ... Start Learning for Free
The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),
  • a)

    Yu/3 + 0.6m, Yd/3 + 0.6m
  • b)
    Yu/3 + 0.6m, Yd/2 + 0.6m
  • c)
    Yu/2 + 0.6m, Yd/3 + 0.6m
  • d)
    Yu/2 + 0.3m, Yd/2 + 0.6m
Correct answer is option 'B'. Can you explain this answer?
Most Upvoted Answer
The minimum depth of upstream and downstream cutoffs respectively in t...
Minimum depth of the upstream cutoff below the upstream floor level = (Yu/ 3 + 0.6m)
Minimum depth of the downstream cutoff below the downstream floor level = (Yd/2 + 0.6m)
Yu = Depth of water in the channel upstream
Yd = Depth of water in the channel downstream
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer?
Question Description
The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer?.
Solutions for The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer?, a detailed solution for The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? has been provided alongside types of The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice The minimum depth of upstream and downstream cutoffs respectively in the design of canal regulators, is (Yu = depth of water in channel upstream and Yd = depth of water in channel downstream),a)Yu/3 + 0.6m, Yd/3 + 0.6mb)Yu/3 + 0.6m, Yd/2 + 0.6mc)Yu/2 + 0.6m, Yd/3 + 0.6md)Yu/2 + 0.3m, Yd/2 + 0.6mCorrect answer is option 'B'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev