Civil Engineering (CE) Exam  >  Civil Engineering (CE) Questions  >  For efficient working of a control meter, its... Start Learning for Free
For efficient working of a control meter, its throat length is approximately kept
  • a)
    equal to the critical depth
  • b)
    twice the critical depth
  • c)
    three times the critical depth
  • d)
    four times the critical depth.
Correct answer is option 'C'. Can you explain this answer?
Most Upvoted Answer
For efficient working of a control meter, its throat length is approxi...
Control Meter and Throat Length

A control meter is a device used in open-channel flow measurement to determine the flow rate of water in a stream or canal. The throat length of a control meter is an important parameter that affects its efficiency in measuring flow rate.

Critical Depth

Critical depth is the depth of flow in an open channel at which the specific energy of the fluid is at a minimum. It is a critical value because any decrease or increase in flow depth will result in an increase in specific energy.

Relation between Throat Length and Critical Depth

The throat length of a control meter is approximately kept three times the critical depth to ensure efficient working. This is because at this ratio, the flow through the meter is nearly uniform and the head loss is minimized.

Benefits of Keeping Throat Length Three Times Critical Depth

Keeping the throat length of a control meter three times the critical depth has several benefits:

1. Uniform Flow: The flow through the control meter is nearly uniform, which ensures accurate measurement of flow rate.

2. Reduced Head Loss: The head loss through the control meter is minimized, which reduces the energy required to maintain flow.

3. Efficient Working: The control meter operates efficiently, providing reliable and consistent measurements of flow rate.

Conclusion

The throat length of a control meter is an important parameter that affects its efficiency in measuring flow rate. Keeping the throat length approximately three times the critical depth ensures efficient working of the meter by providing uniform flow, reducing head loss, and ensuring accurate measurement of flow rate.
Free Test
Community Answer
For efficient working of a control meter, its throat length is approxi...
Throat length is min. dist. b/w the toe and upper size of weld
Explore Courses for Civil Engineering (CE) exam

Similar Civil Engineering (CE) Doubts

Top Courses for Civil Engineering (CE)

For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer?
Question Description
For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer?.
Solutions for For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer?, a detailed solution for For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? has been provided alongside types of For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice For efficient working of a control meter, its throat length is approximately kepta)equal to the critical depthb)twice the critical depthc)three times the critical depthd)four times the critical depth.Correct answer is option 'C'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev