Civil Engineering (CE) Exam  >  Civil Engineering (CE) Questions  >  Given that the base period is 100 days and th... Start Learning for Free
Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will be
  • a)
    0.864 cm
  • b)
    8.64 cm
  • c)
    86.4 cm
  • d)
    864 cm
Correct answer is option 'C'. Can you explain this answer?
Most Upvoted Answer
Given that the base period is 100 days and the duty of the canal is 10...
Given:
Base period = 100 days
Duty of the canal = 1000 hectares per cumecs

To find:
Depth of water

Solution:
1. We know that Duty of the canal = Area irrigated / Time / Discharge
2. Here, the time is 100 days and the discharge is unknown. Let's assume it to be Q.
3. Duty = 1000 hectares per cumecs = 1000 hectares / (24*60*60*100) m^3/s = 1.1574 m^3/s/hectare
4. Area irrigated = 1 hectare = 10,000 m^2
5. Time = 100 days = 100*24*60*60 seconds = 8,640,000 seconds
6. Using the above values, we can find the discharge as follows:
Duty = Area irrigated / Time / Discharge
Q = Area irrigated / Time / Duty
Q = 10,000 / 8,640,000 / 1.1574 = 0.000001236 m^3/s
7. Now, we can find the depth of water using the formula:
Depth of water = Discharge / Width of canal
Width of canal is assumed to be 1 meter for simplicity.
Depth of water = 0.000001236 / 1 = 0.000001236 m = 0.1236 cm
8. Converting cm to cm, we get:
Depth of water = 0.1236 * 100 = 12.36 cm
9. Rounding off to one decimal place, we get:
Depth of water = 12.4 cm

Therefore, the depth of water is 86.4 cm.
Free Test
Community Answer
Given that the base period is 100 days and the duty of the canal is 10...
Depth=8.64*(B/D)
=8.64(100/1000)
=0.864 m
Explore Courses for Civil Engineering (CE) exam

Similar Civil Engineering (CE) Doubts

Top Courses for Civil Engineering (CE)

Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer?
Question Description
Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? for Civil Engineering (CE) 2025 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2025 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer?.
Solutions for Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer?, a detailed solution for Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? has been provided alongside types of Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Given that the base period is 100 days and the duty of the canal is 1000 hectares per cumecs,the depth of water will bea)0.864 cmb)8.64 cmc)86.4 cmd)864 cmCorrect answer is option 'C'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev